National Green Tribunal
Case BriefsTribunals/Commissions/Regulatory Bodies

It was alleged that less than 50 meters of distance between Veeranam Lake and the proposed petrol pump violated the addendum of 16.08.2021 to the guidelines of 7.1.2020 issued by the Central Pollution Control Board.