In Part 2, firstly this article shall analyse the existence of an alternative dispute resolution mechanism in India. Secondly, this article shall study various arbitration cases in space-related disputes and conduct a brief comparative analysis to litigation cases in space-related disputes. Thirdly, this article shall suggest the requisite means and measures to improve the dispute resolution mechanism for space-related disputes.

 

  1. Space Law from the Lens of Indian Standpoint: Does any Alternative Dispute Resolution Mechanism Exist at the Domestic Level?

 

In 2017, the Government of India released the Draft Space Activities Bill, 2017. The Government sought for comments on this draft from the public. This Bill addressed the aspect of private participation in the Indian space sector. It essentially acknowledged the importance and the crucial role that the private sector would play in the near future for the development and enhancement of space-related technology for humanity. However, at the same time, substantial discretion was rested in the hands of the Indian State to essentially control the access to outer space. Regardless of this, the Bill emphasised on the creation of a public-private partnership model to meet the future goals of the space sector, alongside Indian Space Research Organisation (ISRO) inviting the private sector to develop the future satellites.

 

However, the point of conundrum arises is that, when we carefully scrutinise the 2017 Bill, we comprehend that powers have been given to the domestic Indian courts whereas there is no mention of resolution of disputes through arbitration, mediation, and/or negotiation. This lack of mention, accompanied by the Arbitration and Conciliation Act, 1996 and the Indian jurisprudence on arbitration, both being in their nascent stages, proves highly detrimental to the resolution of space-related disputes. This is because, even though the parties in space sector have commercial contracts and agreements that may consist of an arbitration clause, it is pertinent to note that not all disputes may be arbitrable. For example, landlord-tenant disputes were not arbitrable in India until 2020 as they dealt with matters related to public policy and interest. This meant that matters which relate to public policy and interest cannot be arbitrated as such arbitration happens in privacy and confidentiality whereas, these matters are to take place in public forums as that of the civil courts. Due to this, there were multiple conflicting decisions of the High Court and the Supreme Court. However, in December 2020, the Supreme Court finally held that the landlord-tenant disputes are arbitrable as they dealt with subordinate rights in personam that arose from rights in rem.[1] All these conflicts and confusion could have been avoided had there have been an explicit mention about resolution of landlord-tenant disputes through arbitration in the Transfer of Property Act, 1882 with the necessary exemptions of State-specific legislations that provide for specific forums for landlord-tenant disputes redressal.

 

Similarly, in the case of space-related disputes, if there is no mention of arbitration about space-related disputes in the 2017 Bill, it may highly lead to heavy turmoil and confusion despite having arbitration clauses in space-related commercial contracts and agreements, thereby hindering the objective of just, effective, and efficient justice. Although the Supreme Court developed a four-pronged guiding test in Vidya Drolia (2) case[2] –– to ascertain which disputes are non-arbitrable –– that can be applied to decide the arbitrability of space-related disputes, it is pertinent to note that there will be a massive time and resource drainage.

 

This drainage will take place because there will be a substantial time and resources drainage and wastage in deciding whether a space–related dispute is arbitrable. If the Court decides that such outer-space disputes are arbitrable, then there is an unnecessary time and resources lag to commence and conclude arbitration proceedings. This lag can cost both the Parties heavily considering outer-space disputes are enormously expensive. Further, if any Party is unsatisfied with the arbitral award, then they would approach the Court to set it aside. This process of setting aside the arbitral award only adds on to the stress of the previous time and resource lag.

 

Or, if the Court decides that such outer-space disputes are non-arbitrable, then resorting to the traditional, tedious litigation process for adjudication of that space–related dispute and/or getting the previous judgment, that outer–space disputes are non-arbitrable, reviewed by a higher Court/Bench, causes similar time and resources detriment to both the Parties.

 

  1. Study of Arbitration in Space-Related Disputes with a Comparative Analysis of Outer Space Litigation

 

As previously mentioned, the types of space-related disputes may be, but not limited to, late delivery of satellites, problem regarding the launch of a satellite, defective satellites in the orbit, sale and purchase of satellites in the orbit, lease of satellite capacity, right to operate at certain orbital positions, revocation of leased spectrum, and reservation of capacity for governmental use. Thus, taking the aforementioned into consideration, certain arbitration case laws shall be scrutinised for better comprehension.

 

Firstly, the case of Spacecom v. Israel Aerospace Industries was a dispute regarding late delivery of satellites.[3] In this case, Israel Aerospace Industries was supposed to build a satellite for Spacecom and deliver the same by August 2015. However, there were certain delays due to which the satellite was delivered to Spacecom by September 2016. Further, during a prelaunch test, this newly delivered satellite disintegrated. Spacecom initiated arbitration proceedings against Israel Aerospace Industries wherein Spacecom secured an award of USD 10 million in its favour.

 

Secondly, the case of Avanti Communications Group v. Space Exploration Technologies was a dispute regarding launch of satellites.[4] In this case, Avanti contracted with Space Exploration Technologies (hereinafter “SpaceX”) wherein Avanti’s satellite was to be launched aboard a SpaceX Falcon 9 launch vehicle. In pursuance to this contract, SpaceX was mandated to show a certain number of successfully completed launches for their launch vehicle, which they failed to show. Due to this failure, Avanti terminated the contract with SpaceX and requested for a refund as Avanti had already paid the launch cost deposit of USD 7.6 million to SpaceX. SpaceX denied refunding the same amount and Avanti initiated arbitration proceedings against Space X wherein Avanti secured an arbitral award of USD 7.6 million in its favour.

 

Thirdly, the case of Thuraya Satellite Telecommunications v. Boeing Satellite Systems International was a dispute regarding defective satellites in the orbit.[5] Generally, satellite manufacturer’s liability stops from the launch of the satellite. However, in this particular case, a group of insurers brought a claim against Boeing as Boeing’s manufactured satellite lost power in the orbit due to the alleged defective solar panels. Boeing acknowledged that its earlier satellite models contained defects; however, it said that it was not aware about these problems before such satellites were launched and denied concealing such defects from the purchasers of its satellites. The Arbitral Tribunal rejected the insurers’ claim and ordered them to pay Boeing’s full “costs”.

 

Fourthly, the case of ABS v. KT Corpn.[6] was a dispute regarding sale and purchase of satellites in orbit. In this case, ABS contracted with KT Corporation and KTSAT (hereinafter “KT”) for the purchase of a satellite from KT. This satellite was purchased with the requisite US regulatory approvals, but not any Korean regulatory approvals. In 2011, KT delivered the satellite to ABS wherein ABS paid the requisite purchase price of USD 500 million. However, in 2013, Korea’s Ministry of Science, ICT and Future Planning (hereinafter “MSIP”) declared the contract –– between KT and ABS –– as null and void as KT did not comply with Korean regulatory approval. Further, KT was ordered for returning the satellite to its original operating condition. Due to this, KT sent a letter to ABS wherein KT asserted its ownership of the satellite. However, ABS denied the same on two counts: (i) MSIP did not have the authority to nullify the contract between KT and ABS; and (ii) Korean export approval was not necessary because the satellite was not a Korean export but a US export. ABS initiated arbitration proceedings against KT and secured an arbitral award in its favour wherein the title was declared to have been transferred to ABS even before the MSIP nullified the contract. This was because:

 

… ABS and KT fulfilled every prerequisite defined in Article 10.1 of the purchase contract as a condition precedent to the passage of title to the satellite: obtaining export approval by KT and Lockheed Martin for a US export under the regime of the US International Traffic in Arms Regulations (ITAR), delivery of the satellite, payment of the purchase price and issuing of bills of sale.[7]

 

Further, the Arbitral Tribunal also held that the Korean Government did not have any authority to nullify the contract as it held that MSIP was not the competent agency to issue an order of nullification, but the Korean Ministry of Trade, Industry and Energy was competent that remained silent throughout the matter.

 

Fifthly, the case of Avanti Communications v. Govt. of Indonesia was a dispute regarding leasing of satellite capacity.[8] In this case, Indonesia’s satellite malfunctioned in 2015 due to which Indonesia could have lost its orbital slot. The filling of this orbital slot with a new satellite would have taken more than three years but this was problematic to Indonesia because, according to the “use it or lose it” policy, a State may lose its orbital slot if the State leaves the orbital slot vacant for more than three years.[9] To avoid the same conundrum, Indonesia leased capacity on another satellite that could be brought and maintained in Indonesia’s orbital slot until a new Indonesian satellite could be placed. This replacement satellite was owned by Avanti. The lease capacity agreement was worth USD 30 million. Indonesia paid only USD 12 million, leaving a remaining balance of USD 16.8 million as it claimed that the satellite was not fulfilling the requisite purpose. Failure to pay even after a year, due to this, Avanti initiated arbitration proceedings against Indonesia in 2017 and secured an arbitral award in its favour in 2018 wherein Indonesia was ordered to pay Avanti a total sum of USD 20.075 million.

 

Sixthly, the case of Eutelsat SA v. United Mexican States[10] is a dispute regarding reservation of capacity for governmental use. In this case, Eutelsat, a satellite operator, acquired a satellite in 2014. However, according to the regulatory rules of United Mexican States i.e. Mexico, satellite operators are mandated to reserve ninety per cent of their satellite’s overall capacity for governmental use, which the operators could otherwise commercialise. The problem arose at the point wherein Eutelsat claims that it was required to reserve a larger capacity for Mexican Government than its competitors which, in turn, violated the principle of fair and equitable standard under the Mexico-France Bilateral Investment Treaty (BIT). The case is still pending.

 

Seventhly and in finality, there are two noteworthy arbitral disputes that are the Devas arbitrations[11] and the Eutelsat arbitrations[12] that relate to revocation of lease spectrum and the right to operate at orbital positions respectively.

 

Thus, considering the aforementioned cases, it is lucidly evident that a plethora of international arbitration cases have taken place that are related to a conventional manufacturing, purchase, title, or contract-related dispute.

 

However, the query is that whether litigation takes places for space-related disputes. The answer is affirmative as already evident from the 1991 case of Martin Marietta Corpn. v. Intelsat.[13] In this case, Martin Corporation (hereinafter “Martin”) and Intelsat entered into an agreement to launch two satellites. Martin agreed to launch the satellites in return for a consideration worth USD 112 million from Intelsat. Soon after the lift off of the first launch, the payload’s separation system failed to eject the satellite and the satellite’s booster. Although Intelsat’s engineers eventually separated the payload from the rocket, this delay caused in the separation of the payload from the rocket left the satellite in a useless orbit. It was estimated that the cost to rescue and place the satellite in a proper orbit was USD 90 million due to which Martin filed a case in Maryland District Court. In response to this, Intelsat filed a counter case claiming a breach of contract. Further, Intelsat also brought the claims of negligent misrepresentation, negligence and gross negligence to recover the damages for loss of profits, loss of use of satellite, and rescue costs. The District Court’s case lasted for a significant period of time, but it did not end there as the case went to appeal to the Fourth Circuit that disagreed on the District Court’s decision on multiple counts.

 

Thus, the point of consideration, rather than a conundrum, arises is that this significant time and resource lapse, alongside changing decisions of the courts, in Martin case[14], could have been avoided had the matter been referred to arbitration proceedings as arbitration would have not only offered a higher chance at time and resource savings, but also mutual development and agreement for the claim amounts, thereby enabling the development of sustainable and long-lasting relationship between the parties. Similar problems have arisen in the space-related litigation disputes of Appalachian Insurance Co. v. McDonnell Douglas Corpn.[15] and Lexington Insurance v. McDonnell Douglas.[16]

 

Thus, it is lucidly evident that litigation proceedings in already complex and highly technical space-related disputes add on to the existing layers of complexity. Further, it also leads to massive cost and resource drainage and wastage which, in turn, further detriments the space sector from gaining traction in terms of growth, development, and innovation. Therefore, arbitration, mediation and/or negotiation offer the best chance at saving time and resources alongside building long-lasting and sustainable commercial relationships which, in turn, enable the space sector to bloom while protecting its manufacturers, sellers, and service providers.

 

In the following, the author shall conclude with certain recommendations to improve the scenario of dispute resolution in space-–related disputes.

 

  1. Conclusion: What is Actually Written in the Stars for the Future of Dispute Resolution Mechanism in Space-Related Disputes

 

We comprehend that the disputes in the space sector are highly technical and complex in nature due to which the need for arbitration substantially rises and for litigation reduces. However, it is pertinent to note that, in the space sector, the disputes are usually resolved through the process of mediation.[17] The parties resort to arbitration only if the matter escalates.[18] Taking this into account, it can be inferred that mediation is quintessential to resolve space-related disputes. However, considering the fact that the conventions and accords regarding space law are obsolete and ineffective, an imperative need to update and upgrade the same becomes the need of the hour because failure to do so will obstruct in the delivery of justice to the parties. The reason behind the same is that there is a burning need to develop a dispute resolution mechanism that is akin to space-related disputes only, rather than resorting to a general and standard dispute resolution mechanism as previously argued.

 

Thus, firstly, a new, effective, and efficient dispute resolution mechanism of arbitration, mediation, and negotiation (hereinafter “AMN”) can be developed through a top-to-down approach (hereinafter “TDA”). This means that that the law and its related provisions shall flow from the lawmakers to the parties wherein the updation and upgradation of the related conventions, treaties, and accords, alongside the development of specific rules and procedures shall be the responsibility of the lawmakers. It shall involve inclusion of specific and comprehensive provisions related to the dispute resolution mechanism of AMN in the newly updated and upgraded conventions, treaties, accords, and so on. Further, the relevant and requisite suggestions/amendments may be sought from various actors of the space sector for a comprehensive and inclusive development of the dispute resolution mechanism. This approach takes precedence over a down-to-top approach (hereinafter “DTA”) wherein the law and its related provisions flow between the parties while ensuring adherence to the general norms of international law. In other words, in DTA, the parties shall set their own rights, duties, and obligations, while ensuring that such setting does not violate any basic provisions of international law such as justice, fairness, equality, and good faith. DTA is not a preferrable mode because in this approach, there is a lack of uniformity and standardisation in the rights, duties, and obligations of the parties. This lack of uniformity and standardisation may inherently lead to the creation of stark differential treatment for each AMN proceedings which, in turn, may be perceived as discriminatory. Thus, to avoid the same, TDA is preferrable for the creation of an AMN dispute resolution mechanism.

 

Adding on to the aforementioned updation and upgradation of the treaties and so on, it is of quintessence importance for us to comprehend that the PCA Outer Space Arbitration Rules already exist for the purpose of arbitration in space-related disputes. Considering the dynamic and rapid changes in the space sector, wherein the probability of space-related disputes exponentially rise in times of Covid-19 — owing to halt and delay in various businesses and their ancillary industries — the need for utilising and applying these Rules becomes inevitable. This is to ensure faster, effective, and efficient redressal of space-related disputes owing to these Rules expertise and specific draft for space-related disputes. However, to achieve the same, there is a need for creating an awareness regarding these Rules within the space sector. Further, these Rules scope can also be expanded by including provisions and measures for mediation and/or negotiation. The benefit of the same would essentially be of standardisation and uniformity in the Rules for dispute resolution mechanisms as earlier argued.

 

Secondly, it is also imperative for us to comprehend that if the parties choose to go for litigation, then they may choose to go for the International Court of Justice (hereinafter “ICJ”) ad hoc litigation rather than a traditional ICJ litigation. The reason behind the same is that, in the ICJ Statute, there is a provision that enables the creation of ad hoc litigation chambers of the ICJ.[19] According to Article 26 of the ICJ Statute, we comprehend that it enables the creation of two types of chambers: a chamber that deals with a particular case;[20] or one or more chambers that deal with a particular “category” of cases.[21] Thus, we need to comprehend that this type of ad hoc ICJ litigation is far more beneficial than a traditional ICJ litigation because: (i) the ad hoc chambers will be specially equipped with experience and expertise to deal with space-sector related disputes as Article 26(1) enables the creation of chambers for a particular category of cases. This benefit of experience and expertise shall enable ICJ to deliver judgments of higher effectiveness and efficiency which, in turn, will enable the parties to receive appropriate and speedy justice. (ii) Ad hoc chambers act in a manner similar to that of Arbitral Tribunals because these chambers are created especially for specific disputes which is the same case in Arbitral Tribunals. This essentially offers similar benefits of Arbitral Tribunal but in the form of a decision rendered by an ICJ chamber. Further, it is also quintessential to note that these ad hoc chambers decisions are considered as a judgment rendered by the ICJ[22] which, in turn, makes it binding on the parties as per Article 59[23] and thereby increases the authenticity of these decisions.

 

However, the advantages of an ad hoc ICJ chamber over an Arbitral Tribunal must be discussed. These advantages are as follows: (i) From a political standpoint, it has already been observed that ICJ judgments have a higher visibility than an Arbitral Tribunal which, in turn, creates an increased probability of compliance with these judgments.[24] Further, these ICJ judgments are termed as “more prestigious” when compared to arbitral awards.[25] This, in turn, enables a party to bring the other party under the accountability and responsibility factor which may be due to the other party’s inability to fully or partially comply with the judgment. (ii) An ad hoc ICJ litigation chamber is comparatively lesser expensive than an Arbitral Tribunal because, according to Article 33, the “expenses” of the ICJ proceedings shall be borne by ICJ. The parties would be required to only bear their “own costs” for the ICJ proceedings. This encourages small actors of space-related disputes to undertake the same proceedings. Thus, it is lucidly evident that the parties can also resort to ad hoc ICJ litigation, provided the mutual settlement talks and/or mediation and/or arbitration has failed between them.

 

Therefore, considering the fact that there are ample amounts of opportunity for the dispute resolution mechanism for space-related disputes to grow, develop, and evolve, an inevitable need for constant updation and upgradation of the laws and rules arises alongside the creation of an awareness regarding the same.


† Iram Majid, Director of Indian Institute of Arbitration and Mediation (ILAM) and Executive Director of Asia Pacific Centre for Arbitration and Mediation.

[1] Vidya Drolia v. Durga Trading Corpn., (2021) 2 SCC 1 : 2020 SCC OnLine SC 1018.

[2] Ibid.

[3] Jan Frohloff, Arbitration in Space Disputes, 35 Arbitration Int’l 309, 311 (2019).

[4] Id. at 311-312.

[5] Id. at 313.

[6] ICC Case 19958/ AGF/RD/MK (ABS).

[7] Frohloff, supra note 2, at 315.

[8] Id. at 316.

[9] Id. at 317.

[10] ICSID Case No. ARB(AF)/17/2.

[11] See also CC/Devas (Mauritius) Ltd. v. Republic of India, PCA Case No 2013-09 and Devas Multimedia (P) Ltd. v. Antrix Corpn. Ltd., ICC Case 18051/CYK.

[12] See also Eutelsat v. Media Broadcast, Deutsche Telekom; Eutelsat v. SES (Eutelsat) <https://www.international-arbitration-attorney.com/icc-space-arbitration-eutelsat-communications-v-ses/>.

[13] 763 F Supp 1327 (D Md 1991).

[14] Ibid.

[15] 262 Cal Rptr 716, 718 (Cal Ct App 1989).

[16] 49 USC app § 2615 (1988).

[17] Frohloff, supra note 2, at 328.

[18] Ibid.

[19] 1945 3 Bevans 1179, Art. 26 (hereinafter “ICJ Statute”).

[20] Id. at Art. 26(2).

[21] Id. at Art. 26(1).

[22] Id. at Art. 27.

[23] Id. at Art. 59.

[24] Andreas Zimmermann, Ad Hoc Chambers of the International Court of Justice, 8(1) Dickinson Journal of International Law 9, 1-32 (1989).

[25] Ibid.

Must Watch

maintenance to second wife

bail in false pretext of marriage

right to procreate of convict

Criminology, Penology and Victimology book release

Join the discussion

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.