{"id":7039,"date":"2014-07-01T09:07:00","date_gmt":"2014-07-01T09:07:00","guid":{"rendered":"http:\/\/localhost\/sccblog\/?p=7039"},"modified":"2014-07-01T09:22:20","modified_gmt":"2014-07-01T03:52:20","slug":"central-electricity-regulatory-commission-power-system-development-fund-regulations-2014","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/","title":{"rendered":"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014"},"content":{"rendered":"<p   >In exercise of the powers conferred by Sections 178 (1); and 178 (2) (ze) of the Electricity Act, 2003, the Central Electricity Regulatory Commission made the Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 &nbsp;for constituting a fund to be called the <span  >\u201c<\/span>Power System Development Fund<span  >\u201d<\/span>(PSDF) and the utilization of the PSDF. The National Load Despatch Centre (NLDC) is to be the Nodal Agency for the implementation of the scheme under the Regulations. Also, an Appraisal Committee and a Monitoring Committee will be constituted by the Government of India for the <span>prioritization of the various projects proposals for funding from PSDF and sanctions of those projects. Also, procedure for application, screening, appraisal, monitoring, sanction etc of PSDF has been laid down in the Regulations along with assistance pattern, execution, operation &amp; maintenance of the assets, preparation of budget, accounts, and implementation, monitoring and control of projects.<\/span><\/p>\n<p   ><span>To read the notification, <a href=\"http:\/\/www.cercind.gov.in\/2014\/regulation\/noti_95.pdf\"><i>click here<\/i><\/a><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In exercise of the powers conferred by Sections 178 (1); and 178 (2) (ze) of the Electricity Act, 2003, the Central Electricity <\/p>\n","protected":false},"author":3,"featured_media":7321,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[14],"tags":[2652],"class_list":["post-7039","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-foreign","tag-Central_Electricity_Regulatory_Commission"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014\" \/>\n<meta property=\"og:description\" content=\"In exercise of the powers conferred by Sections 178 (1); and 178 (2) (ze) of the Electricity Act, 2003, the Central Electricity\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2014-07-01T09:07:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sucheta\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sucheta\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/\",\"name\":\"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg\",\"datePublished\":\"2014-07-01T09:07:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/7416b8c43cd3a0a3412cf97fc17b54fa\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/7416b8c43cd3a0a3412cf97fc17b54fa\",\"name\":\"Sucheta\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/530d4c250404c869212316d6351878b83f86bf27648031b1e6d4857a4bae4b88?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/530d4c250404c869212316d6351878b83f86bf27648031b1e6d4857a4bae4b88?s=96&d=mm&r=g\",\"caption\":\"Sucheta\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/legal_editor\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/","og_locale":"en_US","og_type":"article","og_title":"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014","og_description":"In exercise of the powers conferred by Sections 178 (1); and 178 (2) (ze) of the Electricity Act, 2003, the Central Electricity","og_url":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2014-07-01T09:07:00+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg","type":"image\/jpeg"}],"author":"Sucheta","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sucheta","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/","url":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/","name":"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014 | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg","datePublished":"2014-07-01T09:07:00+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/7416b8c43cd3a0a3412cf97fc17b54fa"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2014\/07\/01\/central-electricity-regulatory-commission-power-system-development-fund-regulations-2014\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/7416b8c43cd3a0a3412cf97fc17b54fa","name":"Sucheta","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/530d4c250404c869212316d6351878b83f86bf27648031b1e6d4857a4bae4b88?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/530d4c250404c869212316d6351878b83f86bf27648031b1e6d4857a4bae4b88?s=96&d=mm&r=g","caption":"Sucheta"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/legal_editor\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":315944,"url":"https:\/\/www.scconline.com\/blog\/post\/2024\/03\/02\/legislation-roundup-february-2024-legal-update\/","url_meta":{"origin":7039,"position":0},"title":"Legislation Roundup February 2024: Criminal Laws Enforcement Notification; One Donor Gamete in Surrogacy; Additional steps for Paytm Bank; and more","author":"Kriti","date":"March 2, 2024","format":false,"excerpt":"MINISTRY OF HOME AFFAIRS New Criminal Laws notified: Will be effective from July 1, 2024 On 23-2-2024, the Ministry of Home Affairs notified the effective date of Bharatiya Nyaya Sanhita, 2023, the Bharatiya Sakshya Adhiniyam, 2023 the Bharatiya Nagarik Suraksha Sanhita, 2023. READ MORE MINISTRY OF HEALTH AND FAMILY WELFARE\u2026","rel":"","context":"In &quot;Legal RoundUp&quot;","block_context":{"text":"Legal RoundUp","link":"https:\/\/www.scconline.com\/blog\/post\/category\/columns-for-roundup\/"},"img":{"alt_text":"Legislation Roundup February 2024","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/Legislation-Roundup-February-2024.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/Legislation-Roundup-February-2024.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/Legislation-Roundup-February-2024.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/Legislation-Roundup-February-2024.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":154204,"url":"https:\/\/www.scconline.com\/blog\/post\/2017\/09\/06\/electricity-regulatory-commission-allows-extension-to-ntpc-for-interchange-of-power-to-run-design-make-up-water-pumps-through-66-kv-tower-construction\/","url_meta":{"origin":7039,"position":1},"title":"Electricity Regulatory Commission allows extension to NTPC for interchange of power to run design make up water pumps through 66 kV tower construction","author":"Saba","date":"September 6, 2017","format":false,"excerpt":"Central Electricity Regulatory Commission: The petitioner, NTPC Ltd. filed a petition under under Regulation 8 of Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 for seeking permission to allow interchange of power for testing including full load\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":210208,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","url_meta":{"origin":7039,"position":2},"title":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019","author":"Bhumika Indulia","date":"February 18, 2019","format":false,"excerpt":"No. L-1\/144\/2013-CERC\u2014 In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in this behalf, and after previous publication, the Central Electricity Regulatory Commission hereby makes the following regulations, to amend Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations,\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":172394,"url":"https:\/\/www.scconline.com\/blog\/post\/2017\/11\/30\/conduct-parties-sufficient-determine-mode-payment\/","url_meta":{"origin":7039,"position":3},"title":"Conduct of parties sufficient to determine the mode of payment","author":"Saba","date":"November 30, 2017","format":false,"excerpt":"Central Electricity Regulatory Commission:\u00a0In an order passed by Gireesh B Pradhan (Chairperson), AK Singhal, AS Bakshi and MK Iyer (Members) on a\u00a0 petition filed under Section 79(1)(f) of the Electricity Act, 2003 read with Regulations 44 & 45 of CERC (Terms and Conditions of Tariff), Regulations, 2014, the petiton challenged\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":45411,"url":"https:\/\/www.scconline.com\/blog\/post\/2016\/04\/30\/central-electricity-regulatory-commission-indian-electricity-grid-code-fourth-amendment-regulations-2016\/","url_meta":{"origin":7039,"position":4},"title":"Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016","author":"Sucheta","date":"April 30, 2016","format":false,"excerpt":"The Central Electricity Regulatory Commission in exercise of the power conferred under clause (h) of subsection (1) of Section 79 read with clause (g) of sub-section (2) of Section 178 of the Electricity Act, 2003 makes the Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016 to\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":354763,"url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","url_meta":{"origin":7039,"position":5},"title":"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments","author":"Editor","date":"July 28, 2025","format":false,"excerpt":"\u201cThe Commission directs its staff to initiate the consultative process with Grid-India and power exchanges on various operational and procedural aspects for implementing the coupling of day-ahead market.\u201d","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"CERC implements market coupling","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp?resize=700%2C400&ssl=1 2x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/7039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=7039"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/7039\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/7321"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=7039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=7039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=7039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}