{"id":354763,"date":"2025-07-28T16:30:05","date_gmt":"2025-07-28T11:00:05","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=354763"},"modified":"2025-08-23T16:05:28","modified_gmt":"2025-08-23T10:35:28","slug":"cerc-implements-market-coupling-in-a-phased-manner","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","title":{"rendered":"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments"},"content":{"rendered":"<div style=\"text-align: justify; line-height: 150%;\">\n<p style=\"margin-bottom: 3%;\"><span style=\"font-weight: bold;\">Central Electricity Regulatory Commission<\/span>: In the present case, the four-member Bench of Jishnu Barua (Chairperson), Ramesh Babu V. (Member), Harish Dudani (Member) and Ravinder Singh Dhillon (Member), took suo motu cognizance and decided to initiate the process for implementing market coupling in a phased manner. The Commission directed Grid Controller of India (\u2018Grid-India\u2019) to develop the necessary software for running the shadow pilot for coupling term-ahead market (\u2018TAM\u2019) of the power exchanges, and after the software\u2019s development, it should be implemented for three months. Further, Grid-India was directed to share the operational experience of running the shadow pilot, in the form of a feedback report to the Commission.<\/p>\n<h3>Background<\/h3>\n<p>The Commission decided to implement a Shadow Pilot on Power Systems and Cost Optimization through market coupling. Thus, by order dated 6-2-2024, directed Grid-India to implement the following on a shadow pilot basis:<\/p>\n<ol style=\"list-style-type: decimal;\">\n<li>coupling of the real-time market (\u2018RTM\u2019) of the three power exchanges;<\/li>\n<li>separately coupling of the RTM at the three power exchanges along with security-constrained economic dispatch (\u2018SCED\u2019); and<\/li>\n<li>\n<p style=\"margin-bottom: 3%;\">coupling of day-ahead market (\u2018DAM\u2019) of the three power exchanges.<\/p>\n<\/li>\n<\/ol>\n<p style=\"margin-bottom: 3%;\">The Commission, upon Grid-India&#8217;s request, constituted a Committee under the chairmanship of Member, CERC, to oversee the implementation of the shadow pilot of market coupling.<\/p>\n<p style=\"margin-bottom: 3%;\">The Commission directed Grid-India to share the operational experience of running a shadow pilot in the form of a monthly report during the period of four months and a feedback report at the end of the four-month period. Therefore, on 30-6-2025, Grid-India submitted the Feedback Report on D+1 run of shadow pilot on power system and cost optimization through Market Coupling for the four-month period from 1-12-2024 to 31-3-2025.<\/p>\n<h3>Analysis and Decision<\/h3>\n<p>Based on the submissions made by Grid-India and after referring to Regulations 37 to 39 of the Power Market Regulations, 2021 (\u2018PMR\u2019), the Commission decided to initiate the process for implementing market coupling in a phased manner, given as under:<\/p>\n<ol style=\"list-style-type: decimal;\">\n<li>Implementation of the coupling of DAM of power exchanges in a round-robin mode by January 2026 for which power exchanges might act as the market coupling operator (\u2018MCO\u2019) on a rotational basis, with Grid-India being the fourth MCO for backup and audit purposes.<\/li>\n<li>The coupling of RTM of the power exchanges should be considered at a later stage after gaining operational experience from the coupling of DAM.<\/li>\n<li>Some of the complexities involved in RTM-SCED coupling, as highlighted by Grid-India, could be addressed through suitable regulatory interventions and after stakeholder consultation.<\/li>\n<li>\n<p style=\"margin-bottom: 3%;\">The feasibility of coupling of the TAM (including contingency contracts) of the power exchanges also needs to be examined by running a shadow pilot.<\/p>\n<\/li>\n<\/ol>\n<p style=\"margin-bottom: 3%;\">The Commission directed its staff to initiate the consultative process with Grid-India and power exchanges on various operational and procedural aspects for implementing the coupling of DAM and propose the regulatory amendments with respect to the implementation of market coupling.<\/p>\n<p style=\"margin-bottom: 3%;\">The Commission further directed Grid-India to develop the necessary software for running the shadow pilot for coupling TAM (including contingency contracts) of the power exchanges. Post development of necessary software, Grid-India should implement the shadow pilot for coupling TAM (including contingency contracts) of the power exchanges for three months and share the operational experience of running the shadow pilot thereafter in the form of a feedback report to the Commission. Furthermore, to facilitate it, the Commission directed all the power exchanges to share the necessary data and other information as required by the staff of the Commission and Grid-India to analye various operational and procedural aspects for implementing the coupling of DAM.<\/p>\n<p style=\"margin-bottom: 3%;\">[<span style=\"font-weight: bold; color: #632423;\">Directions for Implementing Market Coupling as per Central Electricity Regulatory Commission (Power Market) Regulations, 2021, In Re., <a href=\"http:\/\/www.scconline.com\/DocumentLink\/NhguIqRS\" target=\"_blank\" rel=\"noopener\">2025 SCC OnLine CERC 59<\/a>, decided on 23-7-2025<\/span>]<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p style=\"font-style: italic;\">&#8220;The Commission directs its staff to initiate the consultative process with Grid-India and power exchanges on various operational and procedural aspects for implementing the coupling of day-ahead market.&#8221;<\/p>\n","protected":false},"author":67011,"featured_media":354773,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,11],"tags":[2652,86133,86129,86125,86128,86123,86127,86124,86126,86131,86132,86130],"class_list":["post-354763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-tribunals_commissions_regulatorybodies","tag-Central_Electricity_Regulatory_Commission","tag-day-ahead-market","tag-grid-controller-of-india","tag-harish-dudani-member","tag-implementing-of-market-coupling","tag-jishnu-barua-chairperson","tag-market-coupling","tag-ramesh-babu-v-member","tag-ravinder-singh-dhillon-member","tag-real-time-market","tag-security-constrained-economic-dispatch","tag-term-ahead-market"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CERC implements market coupling in phased manner | SCC Times<\/title>\n<meta name=\"description\" content=\"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments\" \/>\n<meta property=\"og:description\" content=\"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-28T11:00:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-23T10:35:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"886\" \/>\n\t<meta property=\"og:image:height\" content=\"590\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editor\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editor\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/\",\"name\":\"CERC implements market coupling in phased manner | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp\",\"datePublished\":\"2025-07-28T11:00:05+00:00\",\"dateModified\":\"2025-08-23T10:35:28+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/84e42bab48238baf12c7e33b3d9761fe\"},\"description\":\"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp\",\"width\":886,\"height\":590,\"caption\":\"CERC implements market coupling\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/84e42bab48238baf12c7e33b3d9761fe\",\"name\":\"Editor\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/34e366be721c41333586de05faa13743195f5b142dcd7a015c6fabd2389521d0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/34e366be721c41333586de05faa13743195f5b142dcd7a015c6fabd2389521d0?s=96&d=mm&r=g\",\"caption\":\"Editor\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_4\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CERC implements market coupling in phased manner | SCC Times","description":"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","og_locale":"en_US","og_type":"article","og_title":"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments","og_description":"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.","og_url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2025-07-28T11:00:05+00:00","article_modified_time":"2025-08-23T10:35:28+00:00","og_image":[{"width":886,"height":590,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.jpg","type":"image\/jpeg"}],"author":"Editor","twitter_card":"summary_large_image","twitter_title":"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments","twitter_misc":{"Written by":"Editor","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/","name":"CERC implements market coupling in phased manner | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp","datePublished":"2025-07-28T11:00:05+00:00","dateModified":"2025-08-23T10:35:28+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/84e42bab48238baf12c7e33b3d9761fe"},"description":"CERC decided to initiate process for implementing market coupling in phased manner and directed Grid-India to develop necessary software for running shadow pilot for coupling term-ahead market of power exchanges.","breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp","width":886,"height":590,"caption":"CERC implements market coupling"},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/28\/cerc-implements-market-coupling-in-a-phased-manner\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"CERC initiates process of implementing market coupling in phased manner; directs staff to propose regulatory amendments"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/84e42bab48238baf12c7e33b3d9761fe","name":"Editor","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/34e366be721c41333586de05faa13743195f5b142dcd7a015c6fabd2389521d0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/34e366be721c41333586de05faa13743195f5b142dcd7a015c6fabd2389521d0?s=96&d=mm&r=g","caption":"Editor"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_4\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/CERC-implements-market-coupling.webp","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":354541,"url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/25\/cerc-on-compensation-to-db-power-ltd-over-changes-in-law\/","url_meta":{"origin":354763,"position":0},"title":"Inside CERC\u2019s ruling where DB Power Ltd. sought compensation over changes in law, force majeure events relating to Power Purchase Agreements","author":"Editor","date":"July 25, 2025","format":false,"excerpt":"The Appellate Tribunal for Electricity had remanded matter to Central Electricity Regulatory Commission to reconsider issues pertaining to station heat rate, carrying cost, and increase in VAT, Entry Tax, etc. due to change in law, force majeure events affecting petitioner\u2019s project.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"compensation DB Power over changes in law","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":291806,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/05\/11\/cerc-issues-category-iv-licence-for-inter-state-trading-in-electricity-to-thdc-india-ltd-legal-news\/","url_meta":{"origin":354763,"position":1},"title":"CERC issues \u2018Category IV&#8217; licence to THDC India Ltd for inter-State trading in electricity in whole of India","author":"Apoorva","date":"May 11, 2023","format":false,"excerpt":"In accordance with Regulation 3(3) of the Trading Licence Regulations, for a person applying for Category `IV`, a trading licence should have a net worth of Rs. 10 crore and should have maintained minimum current ratio and liquidity ratio of 1:1, as on date of audited balance sheet accompanying the\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"central electricity regulatory commission","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/central-electricity-regulatory-commission.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/central-electricity-regulatory-commission.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/central-electricity-regulatory-commission.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/central-electricity-regulatory-commission.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":293493,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/05\/31\/tribunal-regulatory-bodies-commissions-monthly-roundup-may-2023-legal-news\/","url_meta":{"origin":354763,"position":2},"title":"Tribunal Monthly Roundup May 2023 | Top Stories on Zee-Sony merger, compensation for rat bite in Cinema Hall, Go Air insolvency, and more","author":"Ridhi","date":"May 31, 2023","format":false,"excerpt":"Know about why NGT formed Joint Committee for environmental norms violations in constructions at CM Kejriwal\u2019s residence, relevancy of intent of Corporate Debtor, threshold limit under IBC Code, compensation in Ludhiana Gas Leak incident, etc.","rel":"","context":"In &quot;Legal RoundUp&quot;","block_context":{"text":"Legal RoundUp","link":"https:\/\/www.scconline.com\/blog\/post\/category\/columns-for-roundup\/"},"img":{"alt_text":"tribunal monthly may 2023","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/tribunal-monthly-may-2023.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/tribunal-monthly-may-2023.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/tribunal-monthly-may-2023.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/tribunal-monthly-may-2023.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":296446,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/07\/10\/state-commissions-cannot-decide-trade-margins-ists-power-projects-legal-news\/","url_meta":{"origin":354763,"position":3},"title":"State Commissions cannot modify tariff adopted by Central Commission and adopt trade margin for ISTS power projects: APTEL","author":"Apoorva","date":"July 10, 2023","format":false,"excerpt":"APTEL said that in accordance with the guidelines and the CERC Regulations, the Appropriate Commission, the trading margin shall be decided mutually by the SECI, the trading licensee and the WPPs and in turn by the distribution licensees.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"appellate tribunal for electricity","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":223682,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","url_meta":{"origin":354763,"position":4},"title":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record","author":"Bhumika Indulia","date":"December 30, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Coram of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) dismissed a petition filed for the review of an order dated 09-08-2019. The Review Petitioners stated that the Power Grid Corporation of India Limited (PGCIL) had filed a petition seeking regulatory\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":217749,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/08\/06\/cerc-commission-approves-transmission-charges-of-two-400-kv-lines-for-inclusion-in-computation-of-point-of-connection-transmission-charges\/","url_meta":{"origin":354763,"position":5},"title":"CERC | Commission approves transmission charges of two 400 kV lines for inclusion in computation of point of connection transmission charges","author":"Bhumika Indulia","date":"August 6, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Bench of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) determined the transmission charges for the two 400 kV lines, namely, Seoni (MP)-Sarni (MP) and Seoni (MP)-Bhilai (Chhattisgarh) Transmission lines for the period from 2011-12 to 2013-14, for inclusion in computation\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/354763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/67011"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=354763"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/354763\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/354773"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=354763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=354763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=354763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}