{"id":267469,"date":"2022-05-27T12:30:50","date_gmt":"2022-05-27T07:00:50","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=267469"},"modified":"2022-05-27T11:01:33","modified_gmt":"2022-05-27T05:31:33","slug":"new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/","title":{"rendered":"New timelines notified for replacement of existing meters with smart meters"},"content":{"rendered":"<p style=\"text-align: justify;\"><span dir=\"ltr\" role=\"presentation\">On August 17, 2021, the Central Government has notified the timelines for replacement of existing meters with smart meters with <\/span><span dir=\"ltr\" role=\"presentation\">prepayment feature, vide <a href=\"http:\/\/www.scconline.com\/DocumentLink\/Ll6F9277\">Notification No. 23\/35\/2019-R&amp;R<\/a> . I<\/span><span dir=\"ltr\" role=\"presentation\">n supersession of the notification dated 17<\/span><span dir=\"ltr\" role=\"presentation\">th<\/span> <span dir=\"ltr\" role=\"presentation\">August, 2021, the following timelines are hereby notified. This notification shall be effective from the date of publication in the Gazette of India and the earlier notification dated 17th August, 2021 stands withdrawn.<br \/>\n<\/span><\/p>\n<ol style=\"text-align: justify;\">\n<li><span dir=\"ltr\" role=\"presentation\">All consumers (other than agricultural consumers) in areas with communication network, shall be <\/span><span dir=\"ltr\" role=\"presentation\">supplied electricity with Smart Meters working in prepayment mode, conforming to relevant IS, within the timelines <\/span><span dir=\"ltr\" role=\"presentation\">specified below:<\/span><\/li>\n<\/ol>\n<ul style=\"text-align: justify;\">\n<li style=\"list-style-type: none;\">\n<ul>\n<li><span dir=\"ltr\" role=\"presentation\">All Union Territories, all electrical divisions with high AT&amp;C Loss <\/span><span dir=\"ltr\" role=\"presentation\">(Urban Areas with AT&amp;C loss &gt;15% and rural areas with AT&amp;C loss &gt;25%), Industrial and <\/span><span dir=\"ltr\" role=\"presentation\">Commercial consumers, all Government offices at Block level and above, shall be metered with smart <\/span><span dir=\"ltr\" role=\"presentation\">meters, with prepayment mode, by 31<\/span><span dir=\"ltr\" role=\"presentation\">st<\/span> <span dir=\"ltr\" role=\"presentation\">December, 2023:<\/span><br role=\"presentation\" \/><span dir=\"ltr\" role=\"presentation\">Provided that these areas shall also be covered for smart Distribution Transformer (DT) metering by the <\/span><span dir=\"ltr\" role=\"presentation\">Advanced Metering Infrastructure Service Provider ( AMISP), on a priority basis, by 31<\/span><span dir=\"ltr\" role=\"presentation\">st<\/span> <span dir=\"ltr\" role=\"presentation\">March, 2023;<\/span><br role=\"presentation\" \/><span dir=\"ltr\" role=\"presentation\">Provided also that the State Regulatory Commission may, by notification, extend the said period of <\/span><span dir=\"ltr\" role=\"presentation\">implementation, giving reasons to do so, only twice but not more than six months at a time, for a class <\/span><span dir=\"ltr\" role=\"presentation\">or classes of consumers or for such areas as may be specified in that notification;<\/span><\/li>\n<li><span dir=\"ltr\" role=\"presentation\">All other areas shall be metered with smart meters, with prepayment mode, by 31<\/span><span dir=\"ltr\" role=\"presentation\">st<\/span> <span dir=\"ltr\" role=\"presentation\">March, 2025:<\/span><br role=\"presentation\" \/><span dir=\"ltr\" role=\"presentation\">Provided that in these areas smart Distribution Transformer (DT) metering shall be completed by 31<\/span><span dir=\"ltr\" role=\"presentation\">st <\/span><span dir=\"ltr\" role=\"presentation\">December, 2023;<\/span><\/li>\n<li><span dir=\"ltr\" role=\"presentation\">All feeders shall be metered by 31st December, 2022;<\/span><\/li>\n<li><span dir=\"ltr\" role=\"presentation\">All the feeder meters shall be made communicable under National Feeder Monitoring System <\/span><span dir=\"ltr\" role=\"presentation\">(NFMS) by 31<\/span><span dir=\"ltr\" role=\"presentation\">st<\/span> <span dir=\"ltr\" role=\"presentation\">December, 2022 and shall have Automatic Meter Reading (AMR) facility or shall be <\/span><span dir=\"ltr\" role=\"presentation\">covered under Advanced Metering Infrastructure (AMI).<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p style=\"padding-left: 40px; text-align: justify;\"><span dir=\"ltr\" role=\"presentation\">2. In areas which do not have communication network, installation of prepayment meters, conforming to <\/span><span dir=\"ltr\" role=\"presentation\">relevant IS, may be allowed by the respective State Electricity Regulatory Commission.<\/span><br role=\"presentation\" \/><span dir=\"ltr\" role=\"presentation\">3. All consumer connections, having current carrying capacity beyond that specified in relevant IS, may be <\/span><span dir=\"ltr\" role=\"presentation\">provided with meters with smart meters having AMR facility.<\/span><br role=\"presentation\" \/><span dir=\"ltr\" role=\"presentation\">4. Distribution Transformers (DTs) and High Voltage Distribution System (HVDS) transformers having a <\/span><span dir=\"ltr\" role=\"presentation\">capacity of less than 25 kVA and DTs feeding only agricultural consumers may be excluded from the above <\/span><span dir=\"ltr\" role=\"presentation\">timelines.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On August 17, 2021, the Central Government has notified the timelines for replacement of existing meters with smart meters with prepayment feature, <\/p>\n","protected":false},"author":8808,"featured_media":265982,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4,1193],"tags":[],"class_list":["post-267469","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legislationupdates","category-notifications"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>New timelines notified for replacement of existing meters with smart meters | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New timelines notified for replacement of existing meters with smart meters\" \/>\n<meta property=\"og:description\" content=\"On August 17, 2021, the Central Government has notified the timelines for replacement of existing meters with smart meters with prepayment feature,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-27T07:00:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1331\" \/>\n\t<meta property=\"og:image:height\" content=\"888\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/\",\"name\":\"New timelines notified for replacement of existing meters with smart meters | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg\",\"datePublished\":\"2022-05-27T07:00:50+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg\",\"width\":1331,\"height\":888},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New timelines notified for replacement of existing meters with smart meters\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"New timelines notified for replacement of existing meters with smart meters | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/","og_locale":"en_US","og_type":"article","og_title":"New timelines notified for replacement of existing meters with smart meters","og_description":"On August 17, 2021, the Central Government has notified the timelines for replacement of existing meters with smart meters with prepayment feature,","og_url":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2022-05-27T07:00:50+00:00","og_image":[{"width":1331,"height":888,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/","url":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/","name":"New timelines notified for replacement of existing meters with smart meters | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg","datePublished":"2022-05-27T07:00:50+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg","width":1331,"height":888},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2022\/05\/27\/new-timelines-notified-for-replacement-of-existing-meters-with-smart-meters\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"New timelines notified for replacement of existing meters with smart meters"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":253304,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/08\/27\/ministry-of-power-notifies-timelines-for-the-replacement-of-existing-meters-with-smart-meters-with-prepayment-feature\/","url_meta":{"origin":267469,"position":0},"title":"Ministry of Power notifies timelines for replacement of existing meters with smart meters with prepayment feature","author":"Prachi Bhardwaj","date":"August 27, 2021","format":false,"excerpt":"On August 17, 2021, the Ministry of Power has notified the following timelines for the replacement of existing meters with smart meters with prepayment feature: All consumers (other than agricultural consumers) in areas with communication network, shall be supplied electricity with Smart Meters working in prepayment mode, conforming to relevant\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/08\/MicrosoftTeams-image-175.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/08\/MicrosoftTeams-image-175.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/08\/MicrosoftTeams-image-175.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/08\/MicrosoftTeams-image-175.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/08\/MicrosoftTeams-image-175.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":242860,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","url_meta":{"origin":267469,"position":1},"title":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC","author":"Prachi Bhardwaj","date":"January 27, 2021","format":false,"excerpt":"Adoption of segmentation of a project cannot be adopted as a strategy to avoid environmental clearance impact assessment.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":281194,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/01\/07\/national-green-tribunal-notification-ministry-of-environment-forest-and-climate-change-built-up-area-industrial-sheds-educational-institutions-hospitals-hostels\/","url_meta":{"origin":267469,"position":2},"title":"NGT stays Notification of Ministry delegating the appraisal of Impact Assessment to Local Bodies","author":"Editor","date":"January 7, 2023","format":false,"excerpt":"The Tribunal stayed the operation of notification issued by MoEF&CC modifying the EIA regime in respect of construction projects with built up area more than 20,000 sq. meters to 50,000 sq. meters and industrial sheds, educational institutions, hospitals and hostels for educational institutions more than 20,000 sq. meters upto 1,50,000\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"National Green Tribunal","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/12\/MicrosoftTeams-image-379.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":247184,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/04\/16\/virtual-hearing-of-cases\/","url_meta":{"origin":267469,"position":3},"title":"Madras HC notifies that lawyer&#8217;s chamber shall remain closed from 17th April, 2020; Virtual Hearing of Cases to continue","author":"Bhumika Indulia","date":"April 16, 2021","format":false,"excerpt":"COVID-19 Upsurge | Madras High Court Even though the situation in Tamil Nadu may be better than other places in the country, so as to ensure that immediate preventive measures are taken to arrest the further spread of the pandemic, the State Government has requested the High Court of Madras\u2026","rel":"","context":"In &quot;Hot Off The Press&quot;","block_context":{"text":"Hot Off The Press","link":"https:\/\/www.scconline.com\/blog\/post\/category\/news\/hot_off_the_press\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":83371,"url":"https:\/\/www.scconline.com\/blog\/post\/2016\/11\/01\/the-food-safety-and-standards-food-products-standards-and-food-additives-eleventh-amendment-regulations-2016-notified\/","url_meta":{"origin":267469,"position":4},"title":"The Food Safety and Standards (Food Products Standards and Food Additives) Eleventh Amendment Regulations, 2016, notified","author":"Saba","date":"November 1, 2016","format":false,"excerpt":"F. No. Stds\/SP (Water & Beverages)\/Notif (2)\/FSSAI-2016.\u2014Whereas the draft of the Food\u00a0Safety and Standards (Food Products Standards and Food Additives) Amendment Regulations, 2016, further to amend the Food Safety and Standards (Food Products Standards and Food Additives) Regulations, 2011 were published as required by sub- section (1) of section 92\u2026","rel":"","context":"In &quot;Foreign Legislation&quot;","block_context":{"text":"Foreign Legislation","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/foreign\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/12\/DSC_4762-e1474523869607.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/12\/DSC_4762-e1474523869607.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/12\/DSC_4762-e1474523869607.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/12\/DSC_4762-e1474523869607.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/12\/DSC_4762-e1474523869607.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":265882,"url":"https:\/\/www.scconline.com\/blog\/post\/2022\/04\/26\/electricity-rights-of-consumers-amendment-rules-2022\/","url_meta":{"origin":267469,"position":5},"title":"Electricity (Rights of Consumers) Amendment Rules, 2022","author":"Bhumika Indulia","date":"April 26, 2022","format":false,"excerpt":"On April 20, 2022, the Ministry of Power has issued the Electricity (Rights of Consumers) Amendment Rules, 2022 to amend Electricity (Rights of Consumers) Rules, 2020. Key amendment: Following new definitions have been inserted: (fa) \u201ccustomer average interruption duration index\u201d means the average interruption duration of the sustained interruptions for\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/04\/MicrosoftTeams-image-198.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/267469","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=267469"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/267469\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/265982"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=267469"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=267469"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=267469"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}