{"id":248686,"date":"2021-05-25T15:24:58","date_gmt":"2021-05-25T09:54:58","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=248686"},"modified":"2021-05-28T08:55:46","modified_gmt":"2021-05-28T03:25:46","slug":"levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/","title":{"rendered":"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Supreme Court<\/strong>: In the case where Uttar Pradesh Power Transmission Corporation Ltd had levied cess on CG Power and Industrial Solutions Limited based on CAG report only and had withheld dues in respect of other contracts, the bench of UU Lalit and <strong>Indira Banerjee*,<\/strong> JJ has termed such levy a forcible extraction of cess and has held,<\/p>\n<blockquote>\n<p style=\"text-align: justify;\">\u201c\u2026 the Cess Act and\/or statutory rules framed thereunder prescribe the mode and manner of recovery of outstanding cess under the Cess Act. It is well settled that when statute requires a thing to be done in a particular manner, it is to be done in that manner alone. UPPTCL could not have taken recourse to the methods adopted by it.\u201d<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">The Court was hearing a dispute between Uttar Pradesh Power Transmission Corporation Ltd. (UPPTCL) and CG Power and Industrial Solutions Limited arising out of a Framework Agreement with UPPTCL for construction of 765\/400 KV Substations, at Unnao, Uttar Pradesh.<\/p>\n<p style=\"text-align: justify;\">In terms of the said Framework Agreement, the work was split, and covered by four separate contracts. The first contract was for design, engineering, manufacture, testing at works and supply of all required equipment and materials with accessories and auxiliaries, as detailed in the said contract; the second contract covered erection, testing and commissioning at site including unloading, handling etc.; the third contract covered all civil works including materials for commissioning and handing over of the Substations and the fourth contract covered operations and maintenance for three years.<\/p>\n<p style=\"text-align: justify;\">In sub-clause 5 of the said Frame Work Agreement, under the head \u201cNature of Contract\u201d, it was clearly stated that the first and second contract shall cover all works other than civil works required to be completed.<\/p>\n<p style=\"text-align: justify;\">Notably, cess under the Cess Act is payable in respect of the Third Contract, which covers all civil works. The first and second contracts, which cover all works other than civil works, and do not involve any construction, do not attract cess under the Cess Act.<\/p>\n<p style=\"text-align: justify;\">Cess under the Cess Act read with BOCW Act is leviable in respect of building and other construction works. The condition precedent for imposition of cess under the Cess Act is the construction, repair, demolition or maintenance of and\/or in relation to a building or any other work of construction, transmission towers, in relation inter alia to generation, transmission and distribution of power, electric lines, pipelines etc. Mere installation and\/or erection of pipelines, equipments for generation or transmission or distribution of power, electric wires, transmission towers etc. which do not involve construction work are not amenable to Cess under the Cess Act.<\/p>\n<p style=\"text-align: justify;\">UPPTCL had directed CG Power to remit Labour Cess amounting to Rs.2,60,68,814\/-, computed at 1% of the contract value, under Sections 3 sub-section (1) and (2) of the Building and Other Construction Workers\u2019 Welfare Cess Act, 1996, hereinafter referred to as the \u201cCess Act\u201d, read with Rules 3 and Rule 4 (1), (2) (3) and (4) of the Building and Other Construction Workers Welfare Cess Rules, 1998, hereinafter referred to as the \u201cCess Rules\u201d and also Section 2 (1)(d), (g) and (i) of the Building and Other Construction Workers (Regulation of Employment and Condition of Service) Act, 1996.<\/p>\n<p style=\"text-align: justify;\">It was contended before the Court that the levy of cess on the first contract was unwarranted and illegal. It was argued that the four contracts had been treated as a singular contract solely for the purposes of responsibility for timely execution. For all other intents and purposes, including levy of any tax or fees, the contract for supply was understood by the parties as a separate and distinct contract.<\/p>\n<p style=\"text-align: justify;\">Considering all the aspects, the Court noticed that the terms and clauses of the contract made it amply clear that the first contract was for supply and delivery of equipment and materials. It was a pure supply contract, separate and distinct from civil works contract. The UPPTCL itself understood the Cess Act as not applicable to the Supply Contract and accordingly did not deduct cess from the invoices\/bills of the Respondent.<\/p>\n<p style=\"text-align: justify;\">The Court noted that the UPPTCL demanded and partly realized cess on the supply Contract, solely on the basis of report of the CAG. Hence, in the absence of any adjudication, it was impermissible for UPPTCL to issue the impugned communication to realize cess solely on the basis of the report of the CAG.<\/p>\n<blockquote>\n<p style=\"text-align: justify;\">\u201c\u2026 the action of UPPTCL in forcibly extracting building cess from the Respondent No.1 in respect of the first contract, solely on the basis of the CAG report, is in excess of power conferred on UPPTCL by law or in terms of the contract. In other words, UPPTCL has no power and authority and or jurisdiction to realize labour cess under the Cess Act in respect of the first contract by withholding dues in respect of other contracts and\/or invoking a performance guarantee.\u201d<\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">[Uttar Pradesh Power Transmission Corporation Ltd v. CG Power and Industrial Solutions Limited,\u00a0<a href=\"http:\/\/www.scconline.com\/DocumentLink\/p9s12zNd\"><strong>2021 SCC OnLine SC 383<\/strong><\/a>, decided on 12.05.2021]<\/p>\n<hr \/>\n<p style=\"text-align: justify;\"><strong>Judgment by: Justice Indira Banerjee<\/strong><\/p>\n<blockquote class=\"wp-embedded-content\" data-secret=\"fUb1mHlHW0\"><p><a href=\"https:\/\/www.scconline.com\/blog\/post\/2020\/09\/24\/know-thy-judge-justice-indira-banerjee\/\">Know Thy Judge| Justice Indira Banerjee<\/a><\/p><\/blockquote>\n<p><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;Know Thy Judge| Justice Indira Banerjee&#8221; &#8212; SCC Blog\" src=\"https:\/\/www.scconline.com\/blog\/post\/2020\/09\/24\/know-thy-judge-justice-indira-banerjee\/embed\/#?secret=fUb1mHlHW0\" data-secret=\"fUb1mHlHW0\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/p>\n<p><strong>Appearances before the Court by:\u00a0<\/strong><\/p>\n<p>For Petitioner(s):<\/p>\n<p>Mr. Shishir Prakash, Adv.<\/p>\n<p>Ms. Karuna Krishan Thareja, Adv.<\/p>\n<p>Mr. Rahul Bhatia, AOR<\/p>\n<p>For Respondent(s):<\/p>\n<p>Mr. Ramesh Singh, Sr. Adv.<\/p>\n<p>Ms. Monisha Handa, Adv.<\/p>\n<p>Mr. Mohit D. Ram, AOR<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Supreme Court: In the case where Uttar Pradesh Power Transmission Corporation Ltd had levied cess on CG Power and Industrial Solutions Limited <\/p>\n","protected":false},"author":121,"featured_media":243203,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,9],"tags":[45975,29566,45976,45977],"class_list":["post-248686","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-supremecourt","tag-building-cess","tag-cess","tag-cess-act","tag-labour-cess"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court\" \/>\n<meta property=\"og:description\" content=\"Supreme Court: In the case where Uttar Pradesh Power Transmission Corporation Ltd had levied cess on CG Power and Industrial Solutions Limited\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-05-25T09:54:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-05-28T03:25:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1331\" \/>\n\t<meta property=\"og:image:height\" content=\"888\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Prachi Bhardwaj\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Prachi Bhardwaj\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/\",\"name\":\"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg\",\"datePublished\":\"2021-05-25T09:54:58+00:00\",\"dateModified\":\"2021-05-28T03:25:46+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg\",\"width\":1331,\"height\":888},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942\",\"name\":\"Prachi Bhardwaj\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png\",\"caption\":\"Prachi Bhardwaj\"},\"description\":\"Senior Associate Editor\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_3\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/","og_locale":"en_US","og_type":"article","og_title":"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court","og_description":"Supreme Court: In the case where Uttar Pradesh Power Transmission Corporation Ltd had levied cess on CG Power and Industrial Solutions Limited","og_url":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2021-05-25T09:54:58+00:00","article_modified_time":"2021-05-28T03:25:46+00:00","og_image":[{"width":1331,"height":888,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg","type":"image\/jpeg"}],"author":"Prachi Bhardwaj","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Prachi Bhardwaj","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/","url":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/","name":"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg","datePublished":"2021-05-25T09:54:58+00:00","dateModified":"2021-05-28T03:25:46+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg","width":1331,"height":888},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/25\/levy-of-building-cess-on-a-contract-for-supply-and-delivery-of-equipment-and-materials-impermissible-holds-supreme-court\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Levy of building cess on a contract for supply and delivery of equipment and materials? Impermissible, holds Supreme Court"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942","name":"Prachi Bhardwaj","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png","caption":"Prachi Bhardwaj"},"description":"Senior Associate Editor","url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_3\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-2-7.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":376834,"url":"https:\/\/www.scconline.com\/blog\/post\/2026\/02\/26\/prakash-atlanta-v-nhai-bocw-cess-supreme-court\/","url_meta":{"origin":248686,"position":0},"title":"No Welfare Board, No Cess: Supreme Court Reiterates the Bar on Welfare Cess Collection from Developers","author":"Editor","date":"February 26, 2026","format":false,"excerpt":"by Anshul Prakash*, Deeksha Malik** and Sukriti Shrivastava***","rel":"","context":"In &quot;Experts Corner&quot;","block_context":{"text":"Experts Corner","link":"https:\/\/www.scconline.com\/blog\/post\/category\/experts_corner\/"},"img":{"alt_text":"Prakash Atlanta v NHAI BOCW Cess","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2026\/02\/Prakash-Atlanta-v-NHAI-BOCW-Cess.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2026\/02\/Prakash-Atlanta-v-NHAI-BOCW-Cess.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2026\/02\/Prakash-Atlanta-v-NHAI-BOCW-Cess.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2026\/02\/Prakash-Atlanta-v-NHAI-BOCW-Cess.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":299470,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/08\/17\/labour-cess-not-leviable-supply-materials-jharkhand-high-court-concurs-single-judge\/","url_meta":{"origin":248686,"position":1},"title":"\u2018Labour Cess not leviable on supply of materials for contract distinct from civil works\u2019; Jharkhand High Court concurs with Single Judge Bench","author":"Ridhi","date":"August 17, 2023","format":false,"excerpt":"The Court viewed the levy on consultancy or supply to be a clear deviation from provisions of Cess Act.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"jharkhand high court","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/jharkhand-high-court.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/jharkhand-high-court.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/jharkhand-high-court.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/jharkhand-high-court.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":6266,"url":"https:\/\/www.scconline.com\/blog\/post\/2014\/09\/10\/mangalya-nidhi-cess-declared-unconstitutional-by-the-kerala-high-court\/","url_meta":{"origin":248686,"position":2},"title":"\u201cMangalya Nidhi\u201d Cess declared unconstitutional by the Kerala High Court","author":"Sucheta","date":"September 10, 2014","format":false,"excerpt":"Kerala High Court: While deciding a case with respect to the constitutionality of the \u201cMangalya Nidhi\u201d cess under Section 11 of the Kerala Finance Act, 2013, K. Vinod Chandran, J allowed the writ petition and directed the State to refund the amount already collected in the form of cess only\u2026","rel":"","context":"In &quot;High Courts&quot;","block_context":{"text":"High Courts","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/highcourts\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/10\/scc-blog_Page_9.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":248188,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/14\/when-can-high-court-entertain-a-writ-petition-notwithstanding-the-availability-of-an-alternative-remedy-supreme-court-explains\/","url_meta":{"origin":248686,"position":3},"title":"When can High Court entertain a writ petition, notwithstanding the availability of an alternative remedy? Supreme Court explains","author":"Prachi Bhardwaj","date":"May 14, 2021","format":false,"excerpt":"\"The availability of an alternative remedy does not prohibit the High Court from entertaining a writ petition in an appropriate case.\"","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-3-3.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-3-3.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-3-3.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-3-3.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-3-3.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":206830,"url":"https:\/\/www.scconline.com\/blog\/post\/2018\/12\/14\/any-cess-levied-under-a-repealed-act-is-impermissible-meghalaya-hc\/","url_meta":{"origin":248686,"position":4},"title":"Any cess levied under a repealed Act is impermissible: Meghalaya HC","author":"Bhumika Indulia","date":"December 14, 2018","format":false,"excerpt":"Meghalaya High Court: A Division Bench comprising of Mohammad Yaqoob Mir, CJ and S.R. Sen, J. dismissed a petition on being infructuous. The Advocate General A. Kumar has submitted that the Meghalaya Clinker Cess Act, 2015 has been repealed by the Meghalaya Goods and Services Tax Act, 2017; consequently, there\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":80381,"url":"https:\/\/www.scconline.com\/blog\/post\/2016\/10\/20\/construction-workers-not-covered-by-the-factories-act-1948-and-are-entitled-to-the-welfare-measure-specifically-provided-under-bocw-act-1996-and-welfare-cess-act-1996\/","url_meta":{"origin":248686,"position":5},"title":"Construction workers not covered by the Factories Act, 1948 and are entitled to the welfare measure specifically provided under BOCW ACT, 1996 and Welfare Cess Act, 1996","author":"Prachi Bhardwaj","date":"October 20, 2016","format":false,"excerpt":"Supreme Court: The Bench of Dr. A.K. Sikri and N.V. Ramana, JJ held that construction workers are not covered by the Factories Act, 1948 and, therefore, are entitled to the welfare measure specifically provided for such workers under the Building and Other Construction Workers (Regulation of Employment and Conditions of\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2015\/11\/DSC_5487.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/248686","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/121"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=248686"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/248686\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/243203"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=248686"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=248686"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=248686"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}