{"id":242860,"date":"2021-01-27T08:08:26","date_gmt":"2021-01-27T02:38:26","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=242860"},"modified":"2021-01-29T09:49:19","modified_gmt":"2021-01-29T04:19:19","slug":"is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","title":{"rendered":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Supreme Court<\/strong>: The 3-judge bench of <strong>L. Nageswara Rao<\/strong>*, Hemant Gupta and Ajay Rastogi, jj has directed the Ministry of Environment, Forest and Climate Change, Government of India to constitute an Expert Committee to examine whether segmentation is permissible for National Highway projects beyond a distance of 100 kms and, if permissible, under what circumstances.<\/p>\n<h3 style=\"text-align: justify;\"><span style=\"color: #008000;\"><strong>Background<\/strong><\/span><\/h3>\n<p style=\"text-align: justify;\">The said direction came in the case relating to the environmental clearance for expansion of National Highway 45-A between Villuppuram to Nagapattinam for a distance of 179.555 kms as a part of the Bharatmala Pariyojana project. Admittedly, no environmental impact assessment was undertaken. The National Highway Authority of India had challenged the Madras High Court decision holding that the environmental clearance for the said project was necessary.<\/p>\n<p style=\"text-align: justify;\">Environmental clearance under the Notifications dated 14.09.2006 and 22.08.2013 is required only if the additional right of way or land acquisition is greater than 40 meters on existing alignments and 60 meters on realignments or bypasses. It was NHAI\u2019s case that environmental clearance is not required as the additional right of way or land acquisition was not greater than the limits specified in the Notification even if the expansion of the National Highways is beyond 100 km. In view of the bifurcation of the National Highway 45-A into four packages and each package being less than 100 km, NHAI contended that the Notifications dated 14.09.2006 and 22.08.2013 are not applicable.<\/p>\n<h3 style=\"text-align: justify;\"><span style=\"color: #008000;\"><strong>What does the Notification state?<\/strong><\/span><\/h3>\n<p style=\"text-align: justify;\">As per Item 7 (f) to the Notification dated 22.08.2013, expansion of a National Highway project needs prior environmental clearance in case<\/p>\n<p style=\"text-align: justify; padding-left: 40px;\">(a) expansion of the National Highway project is greater than 100 km. and<\/p>\n<p style=\"text-align: justify; padding-left: 40px;\">(b) it involves additional right of way or land acquisition greater than 40 meters on existing alignments and 60 meters on realignments or bypasses.<\/p>\n<p style=\"text-align: justify;\">If the project involves expansion of a National Highway greater than 100 km, prior environmental clearance would be required only if it involves additional right of way or land acquisition greater than 40 meters on existing alignments and 60 meters on realignments or by passes.<\/p>\n<p style=\"text-align: justify;\">A statutory rule or Notification is to be treated as a part of the statute. Rules made under a statute must be treated for all purposes of construction or obligation exactly as if they were in the Act, are to be of the same effect as if they are contained in the Act, and are to be judicially noticed for all purposes of construction or obligation. The principles of interpretation of subordinate legislation are applicable to the interpretation of statutory Notifications.<\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #800080;\">\u201cIf the words of the statute are in themselves precise and unambiguous, then no more can be necessary than to expound those words in their natural and ordinary sense. The words themselves do alone in such cases best declare the intent of the law-giver.\u201d<\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\">In the current case, there is no ambiguity or scope for two interpretations. Hence, adopting the golden rule of interpretation the Court that there is no requirement of prior environmental clearance for expansion of a National Highway project merely because the distance is greater than 100 km.<\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #800080;\">\u201cIt is a cardinal principle of interpretation that full effect has to be given to every word of the Notification . Interpreting the Notification dated 22.08.2013 to mean that every expansion of National Highway which is greater than 100 km requires prior environmental clearance would be making the other words in Item 7 (f) redundant and otiose.\u201d<\/span><\/p>\n<\/blockquote>\n<h3 style=\"text-align: justify;\"><span style=\"color: #008000;\"><strong>Segmentation of National Highway projects beyond a distance of 100 kms<\/strong><\/span><\/h3>\n<p style=\"text-align: justify;\">The Court agreed with the High Court that segmentation as a strategy is not permissible for evading environmental clearance as per Notifications dated 14.09.2006 and 22.08.2013 and was hence, of the opinion that an expert committee should examine the permissibility of segregation.<\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #800080;\">\u201cAs the question of permissibility of the segmentation of a National Highway beyond a distance of 100 kms is a matter to be considered by experts, it would be necessary for a committee to be constituted by the Government of India to decide whether segmentation of a National Highway project beyond a distance of 100 kms is permissible. If it is permissible, the circumstances under which segmentation can be done also requires to be examined by the expert committee.\u201d<\/span><\/p>\n<\/blockquote>\n<h3 style=\"text-align: justify;\"><span style=\"color: #008000;\"><strong>Conclusion<\/strong><\/span><\/h3>\n<ul style=\"text-align: justify;\">\n<li>There is no requirement for obtaining environmental clearances for NH 45-A Villuppuram-Nagapattinam Highway as land acquisition is not more than 40 meters on existing alignments and 60 meters on realignments or by passes.<\/li>\n<li>NHAI has to strictly conform to the Notification dated 14.09.2006 as amended by the Notification dated 22.08.2013 in the matter of acquisition of land being restricted to 40 meters on the existing alignments and 60 meters on realignments.<\/li>\n<li>Ministry of Environment, Forest and Climate Change, Government of India to constitute an Expert Committee to examine whether segmentation is permissible for National Highway projects beyond a distance of 100 kms and, if permissible, under what circumstances<\/li>\n<li>NHAI has to fulfil the requirement of reafforestation in accordance with the existing legal regime. There is an obligation on the part of the Appellant to plant ten trees for each felled tree.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\">[National Highway Authority of India v. Pandarinathan Govindarajulu,\u00a0 <a href=\"http:\/\/www.scconline.com\/DocumentLink\/M1umDz77\"><b>2021 SCC OnLine SC 28<\/b><\/a>, decided on 19.01.2021]<\/p>\n<hr \/>\n<p><strong>*Justice L. Nageswara Rao has penned this judgment<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Adoption of segmentation of a project cannot be adopted as a strategy to avoid environmental clearance impact assessment.<\/p>\n","protected":false},"author":121,"featured_media":154914,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,9],"tags":[31849,31312,31683],"class_list":["post-242860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-supremecourt","tag-environmental-clearance","tag-national-highway-authority-of-india","tag-nhai"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.4 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&amp;CC&#039;s Expert Committee to examine, directs SC | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&amp;CC&#039;s Expert Committee to examine, directs SC\" \/>\n<meta property=\"og:description\" content=\"Adoption of segmentation of a project cannot be adopted as a strategy to avoid environmental clearance impact assessment.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-27T02:38:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-29T04:19:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Prachi Bhardwaj\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Prachi Bhardwaj\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/\"},\"author\":{\"name\":\"Prachi Bhardwaj\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/#\\\/schema\\\/person\\\/de579aff4bc6dd24b68d6d472ac92942\"},\"headline\":\"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC\",\"datePublished\":\"2021-01-27T02:38:26+00:00\",\"dateModified\":\"2021-01-29T04:19:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/\"},\"wordCount\":853,\"commentCount\":1,\"image\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/Supreme-Court_Colour.jpg\",\"keywords\":[\"Environmental clearance\",\"National Highway Authority of India\",\"NHAI\"],\"articleSection\":[\"Case Briefs\",\"Supreme Court\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/\",\"url\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/\",\"name\":\"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&CC's Expert Committee to examine, directs SC | SCC Times\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/Supreme-Court_Colour.jpg\",\"datePublished\":\"2021-01-27T02:38:26+00:00\",\"dateModified\":\"2021-01-29T04:19:19+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/#\\\/schema\\\/person\\\/de579aff4bc6dd24b68d6d472ac92942\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/Supreme-Court_Colour.jpg\",\"contentUrl\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/Supreme-Court_Colour.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/2021\\\/01\\\/27\\\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/#\\\/schema\\\/person\\\/de579aff4bc6dd24b68d6d472ac92942\",\"name\":\"Prachi Bhardwaj\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/Prachi-Image2-150x150.png\",\"url\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/Prachi-Image2-150x150.png\",\"contentUrl\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/wp-content\\\/uploads\\\/2021\\\/04\\\/Prachi-Image2-150x150.png\",\"caption\":\"Prachi Bhardwaj\"},\"description\":\"Senior Associate Editor\",\"url\":\"https:\\\/\\\/www.scconline.com\\\/blog\\\/post\\\/author\\\/editor_3\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&CC's Expert Committee to examine, directs SC | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","og_locale":"en_US","og_type":"article","og_title":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&CC's Expert Committee to examine, directs SC","og_description":"Adoption of segmentation of a project cannot be adopted as a strategy to avoid environmental clearance impact assessment.","og_url":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2021-01-27T02:38:26+00:00","article_modified_time":"2021-01-29T04:19:19+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","type":"image\/jpeg"}],"author":"Prachi Bhardwaj","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Prachi Bhardwaj","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#article","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/"},"author":{"name":"Prachi Bhardwaj","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942"},"headline":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC","datePublished":"2021-01-27T02:38:26+00:00","dateModified":"2021-01-29T04:19:19+00:00","mainEntityOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/"},"wordCount":853,"commentCount":1,"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","keywords":["Environmental clearance","National Highway Authority of India","NHAI"],"articleSection":["Case Briefs","Supreme Court"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","url":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/","name":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&CC's Expert Committee to examine, directs SC | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","datePublished":"2021-01-27T02:38:26+00:00","dateModified":"2021-01-29T04:19:19+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2021\/01\/27\/is-segmentation-permissible-for-national-highway-projects-beyond-a-distance-of-100-kms-moefccs-expert-committee-to-examine-directs-sc\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Is segmentation permissible for National Highway projects beyond a distance of 100 kms? MoEF&#038;CC&#8217;s Expert Committee to examine, directs SC"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/de579aff4bc6dd24b68d6d472ac92942","name":"Prachi Bhardwaj","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Prachi-Image2-150x150.png","caption":"Prachi Bhardwaj"},"description":"Senior Associate Editor","url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_3\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":255703,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/10\/16\/2021-scc-vol-6-part-4\/","url_meta":{"origin":242860,"position":0},"title":"2021 SCC Vol. 6 Part 4","author":"Bhumika Indulia","date":"October 16, 2021","format":false,"excerpt":"Criminal Procedure Code, 1973 \u2014 S. 439 \u2014 Bail: In this case, application for bail, by petitioner accused, a sitting MP was rejected by Single Judge of High Court. Custodial torture of petitioner was alleged before Division Bench of High Court which directed his medical examination. Both aforesaid orders were\u2026","rel":"","context":"In &quot;Cases Reported&quot;","block_context":{"text":"Cases Reported","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casesreported\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/SCC_Standard.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/SCC_Standard.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/SCC_Standard.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/SCC_Standard.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/SCC_Standard.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":258513,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/12\/15\/chardham-highway-project-environmental-compliance-not-a-mere-checkbox-committee-headed-by-justice-ak-sikri-to-oversee-implementation-of-hpcs-recommendations-sc\/","url_meta":{"origin":242860,"position":1},"title":"Chardham Highway Project| Environmental compliance not a mere \u201ccheckbox&#8221;; Committee headed by Justice AK Sikri to oversee implementation of HPC&#8217;s recommendations: SC","author":"Prachi Bhardwaj","date":"December 15, 2021","format":false,"excerpt":"\"Piecemeal implementation of some mitigation measures for protection of the environment, without any concrete strategy in place, cannot pass muster.\u201d","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/07\/MicrosoftTeams-image-13.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/07\/MicrosoftTeams-image-13.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/07\/MicrosoftTeams-image-13.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/07\/MicrosoftTeams-image-13.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/07\/MicrosoftTeams-image-13.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":240343,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/12\/08\/prior-environmental-clearance-required-before-commencement-of-actual-construction-of-a-national-highway-not-at-the-planning-stage-sc\/","url_meta":{"origin":242860,"position":2},"title":"Prior environmental clearance required before commencement of actual construction of a National Highway, not at the planning stage: SC","author":"Prachi Bhardwaj","date":"December 8, 2020","format":false,"excerpt":"Supreme Court: The 3-judge bench of AM Khanwilkar*, BR Gavai and Krishna Murari, JJ has held that it is not necessary for the Central Government or NHAI to apply for prior environmental\/forest clearances or permissions before issuing notification under Section 2(2) declaring the stretch\/section to be a national highway or\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/09\/Supreme-Court_Colour.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":240353,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/12\/09\/centre-versus-state\/","url_meta":{"origin":242860,"position":3},"title":"Centre versus State| Who has the power to make law declaring any land within a State as a national highway? Supreme Court answers","author":"Prachi Bhardwaj","date":"December 9, 2020","format":false,"excerpt":"Supreme Court: Dealing with the question whether the Parliament was competent to enact the National Highways Act, 1956 and the National Highway Authority of India Act, 1988 for construction of new roads traversing through the open green-fields, the 3-judge bench of AM Khanwilkar*, BR Gavai and Krishna Murari, JJ has\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2020\/11\/sc-08-2.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2020\/11\/sc-08-2.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2020\/11\/sc-08-2.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2020\/11\/sc-08-2.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2020\/11\/sc-08-2.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":243148,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/02\/01\/supreme-court-monthly-roundup-january-2021\/","url_meta":{"origin":242860,"position":4},"title":"Supreme Court Monthly Roundup &#8211; January 2021","author":"Prachi Bhardwaj","date":"February 1, 2021","format":false,"excerpt":"TOP STORIES Supreme Court gives a go-ahead to Central Vista Project in a 2:1 verdict \u201cWhat purpose will a public interest proceeding serve if the fulfilment of one notion of public interest leads to a clear subjugation of another legitimate action of the State taken in public interest concerning project\u2026","rel":"","context":"In &quot;Legal RoundUp&quot;","block_context":{"text":"Legal RoundUp","link":"https:\/\/www.scconline.com\/blog\/post\/category\/columns-for-roundup\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-roundup-2-1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-roundup-2-1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-roundup-2-1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-roundup-2-1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/02\/sc-roundup-2-1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":273720,"url":"https:\/\/www.scconline.com\/blog\/post\/2022\/09\/15\/supreme-court-national-green-tribunal-jurisdiction-environmental-clearance-project-proponent-section3-environment-protection-act-1986-expert-appraisal-committee-ministry-of-environment-forest-and-c\/","url_meta":{"origin":242860,"position":5},"title":"Entire country under impression that Re-Rolling Steel Plants do not require prior Environmental Clearance; NGT right in giving such plants opportunity to meet the requirement: SC","author":"Editor","date":"September 15, 2022","format":false,"excerpt":"Supreme Court: In an appeal regarding the jurisdiction of National Green Tribunal\u2019s (NGT) to pass an order to operate a unit without Environmental Clearance and against the decision of closure of the unit, the bench of Hemant Gupta* and Vikram Nath, JJ. has observed that there was no error in\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/09\/Entire-country-under-impression-that-Re-Rolling-Steel-Plants-do-not-require-prior-Environmental-Clearance-NGT-right-in-giving-such-plants-opportunity-to-meet-the-requirement-1.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/09\/Entire-country-under-impression-that-Re-Rolling-Steel-Plants-do-not-require-prior-Environmental-Clearance-NGT-right-in-giving-such-plants-opportunity-to-meet-the-requirement-1.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/09\/Entire-country-under-impression-that-Re-Rolling-Steel-Plants-do-not-require-prior-Environmental-Clearance-NGT-right-in-giving-such-plants-opportunity-to-meet-the-requirement-1.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/09\/Entire-country-under-impression-that-Re-Rolling-Steel-Plants-do-not-require-prior-Environmental-Clearance-NGT-right-in-giving-such-plants-opportunity-to-meet-the-requirement-1.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/09\/Entire-country-under-impression-that-Re-Rolling-Steel-Plants-do-not-require-prior-Environmental-Clearance-NGT-right-in-giving-such-plants-opportunity-to-meet-the-requirement-1.png?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/242860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/121"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=242860"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/242860\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/154914"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=242860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=242860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=242860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}