{"id":223682,"date":"2019-12-30T13:40:12","date_gmt":"2019-12-30T08:10:12","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=223682"},"modified":"2020-01-03T11:25:19","modified_gmt":"2020-01-03T05:55:19","slug":"cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","title":{"rendered":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Central Electricity Regulatory Commission (CERC):<\/strong> The Coram of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) dismissed a petition filed for the review of an order dated 09-08-2019.<\/p>\n<p style=\"text-align: justify;\">The Review Petitioners stated that the Power Grid Corporation of India Limited (PGCIL) had filed a petition seeking regulatory approval for execution of the transmission system for Solar Energy Zones in Rajasthan where it had estimated a total power transfer of 8900 MW generation from Western Region and initially only 3100 MW related to LTA quantum and PPA had been signed for 1300 MW. It was noted in the impugned order that LTA had been granted for approximately 4000 MW and PPA had been signed for 2000 MW and the Review petitioners were concerned with the adverse financial implication in terms of load flow and transmission charges and requested that there should be some proper mechanism or method to share transmission charges of ISTS assets created for evacuating power from solar rich states. The Commission in the order had taken in consideration the concerns raised for burden but did not consider the problem of transmission charges thus the instant petition.<\/p>\n<p style=\"text-align: justify;\">The Coram while dismissing the petition explained that since the petition was filed on the basis of errors in the order and what constitutes an error apparent on the face of record is a matter to be found in context of the facts of each case and more than a mere error and it must be one which must be manifested on the face of the record thus the parties are not entitled to rehearing of the same issue but the issue can be decided just by a perusal of the records and if it is manifested can be set right by reviewing the order further the Commission had already issued draft Central Electricity Regulatory Commission (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2019 on 31-10-2019. The Review Petitioner is at its liberty to file comments on the same and the Review Petitioner could not establish any error or mistake in the order on the face of the record. [Ajmer Vidyut Vitran Nigam Ltd. v. Power Grid Corpn. of India Ltd., <a href=\"http:\/\/www.scconline.com\/DocumentLink\/PRcc5sUi\"><b>2019 SCC OnLine CERC 214<\/b><\/a>, decided on 09-12-2019]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Central Electricity Regulatory Commission (CERC): The Coram of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) dismissed a petition <\/p>\n","protected":false},"author":8808,"featured_media":210209,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,11],"tags":[39054],"class_list":["post-223682","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-tribunals_commissions_regulatorybodies","tag-plea-of-rehearing"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CERC | Plea of rehearing rejected where an error could not be established on the face of the record | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CERC | Plea of rehearing rejected where an error could not be established on the face of the record\" \/>\n<meta property=\"og:description\" content=\"Central Electricity Regulatory Commission (CERC): The Coram of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) dismissed a petition\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-30T08:10:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-03T05:55:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/\",\"name\":\"CERC | Plea of rehearing rejected where an error could not be established on the face of the record | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"datePublished\":\"2019-12-30T08:10:12+00:00\",\"dateModified\":\"2020-01-03T05:55:19+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CERC | Plea of rehearing rejected where an error could not be established on the face of the record\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","og_locale":"en_US","og_type":"article","og_title":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record","og_description":"Central Electricity Regulatory Commission (CERC): The Coram of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) dismissed a petition","og_url":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2019-12-30T08:10:12+00:00","article_modified_time":"2020-01-03T05:55:19+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","url":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/","name":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","datePublished":"2019-12-30T08:10:12+00:00","dateModified":"2020-01-03T05:55:19+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/12\/30\/cerc-plea-of-rehearing-rejected-where-an-error-could-not-be-established-on-the-face-of-the-record\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"CERC | Plea of rehearing rejected where an error could not be established on the face of the record"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":282401,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/01\/25\/cerc-imposition-of-safeguard-duty-on-import-a-change-in-law-event-legal-research-legal-news-updates\/","url_meta":{"origin":223682,"position":0},"title":"CERC| Imposition of Safeguard Duty on import is a \u2018Change in Law\u2019 event in Power Purchase Agreement","author":"Editor","date":"January 25, 2023","format":false,"excerpt":"The Central Electricity Regulatory Commission held that the imposition of Safeguard Duty through notification issued by Department of Revenue is a \u2018Change in Law\u2019 event as per Article 12 of Power Purchase Agreement.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"CERC","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/01\/MicrosoftTeams-image14.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":354541,"url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/25\/cerc-on-compensation-to-db-power-ltd-over-changes-in-law\/","url_meta":{"origin":223682,"position":1},"title":"Inside CERC\u2019s ruling where DB Power Ltd. sought compensation over changes in law, force majeure events relating to Power Purchase Agreements","author":"Editor","date":"July 25, 2025","format":false,"excerpt":"The Appellate Tribunal for Electricity had remanded matter to Central Electricity Regulatory Commission to reconsider issues pertaining to station heat rate, carrying cost, and increase in VAT, Entry Tax, etc. due to change in law, force majeure events affecting petitioner\u2019s project.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"compensation DB Power over changes in law","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":316028,"url":"https:\/\/www.scconline.com\/blog\/post\/2024\/03\/04\/objective-purpose-timelines-ensure-early-supply-green-energy-reduction-carbon-footprint-sc-directs-seci-recover-bank-guarantee\/","url_meta":{"origin":223682,"position":2},"title":"Timelines in renewable energy sector ensure early supply of green energy and reduction of carbon footprint: SC directs SECI to recover bank guarantee","author":"Apoorva","date":"March 4, 2024","format":false,"excerpt":"Supreme Court added that if the payment of Rs.10 crores along with interest as directed, is not refunded within six months from the date of this order, SECI will be entitled to recover Rs. 10 crores plus interest as per the provisions of the Electricity Act, 2003.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"SECI","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/SECI.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/SECI.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/SECI.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/03\/SECI.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":359640,"url":"https:\/\/www.scconline.com\/blog\/post\/2025\/09\/10\/supreme-court-discoms-coal-shortage-cost-sharing\/","url_meta":{"origin":223682,"position":3},"title":"DISCOMS must share coal shortage costs equally, cannot claim priority for power supply based either on prior date of agreement or coal source: Supreme Court","author":"Apoorva","date":"September 10, 2025","format":false,"excerpt":"Supreme Court reaffirmed that none of the DISCOMs, including GRIDCO could claim priority for power supply based on the date of their agreements or based on any specific coal allocation reference. The principle to be followed was that coal supply must be proportionately allocated among the DISCOMs based on the\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"coal shortage costs","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/09\/sc-03-31.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/09\/sc-03-31.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/09\/sc-03-31.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/09\/sc-03-31.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":290359,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/04\/22\/adani-power-entitled-to-change-in-law-for-100-of-contracted-capacity-which-is-70-of-installed-capacity-of-the-phase-iv-extension-of-mundra-project-supreme-court-legal-resear\/","url_meta":{"origin":223682,"position":4},"title":"Adani power entitled to Change in Law for 100% of contracted capacity which is 70% of installed capacity of Phase IV extension of Mundra Project: Supreme Court","author":"Apoorva","date":"April 22, 2023","format":false,"excerpt":"The Supreme Court opined that it is unjust on the part of Haryana Utilities to say that 70% of the installed capacity should be further bifurcated and the Change in Law benefit should be restricted only to 70% of the installed capacity.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"adani power","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/04\/adani-power.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/04\/adani-power.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/04\/adani-power.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/04\/adani-power.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":223751,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/01\/02\/cerc-electricity-act-read-with-trading-margin-regulations-gives-contracting-parties-the-freedom-to-mutually-agree-on-trading-margin-for-any-trading-transaction\/","url_meta":{"origin":223682,"position":5},"title":"CERC | Electricity Act read with Trading Margin Regulations gives contracting parties freedom to mutually agree on Trading Margin for any trading transaction","author":"Bhumika Indulia","date":"January 2, 2020","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): A coram of Justice P.K. Pujari (Chairperson), M.K. Iyer (Member) and I.S. Jha (Member) disposed of a petition filed under Section 63 of the Electricity Act, 2003 seeking adoption of tariff for 1000 MW (Tranche-II) Wind Power Projects connected to the Inter-State Transmission System (ISTS)\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/223682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=223682"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/223682\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/210209"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=223682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=223682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=223682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}