{"id":222709,"date":"2019-11-30T11:30:21","date_gmt":"2019-11-30T06:00:21","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=222709"},"modified":"2019-12-05T12:57:51","modified_gmt":"2019-12-05T07:27:51","slug":"bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/","title":{"rendered":"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state"},"content":{"rendered":"<p style=\"text-align: justify;\"><b>Bombay High Court:<\/b>\u00a0G.S.Patel, J., held that an arbitration agreement must be stamped in the state where the arbitration is to take place, even if the only &#8220;thing to be done&#8221; in the state is the arbitration of the dispute. In this particular case, the contract was executed outside the state and was concerned with work that was to be carried out in Visakhapatnam, however the arbitration clause specified that in case of any dispute, arbitration would take place in Mumbai. The main agreement had been stamped as per relevant laws in Visakhapatnam. When a dispute arose and the parties couldn\u2019t decide upon an arbitrator by themselves, the matter was referred to the Bombay High Court under Section 11 of the Arbitration and Conciliation Act, 1996. Upon doing so, a further dispute arose as to whether the arbitration agreement would be recognised in Maharashtra as it was not stamped there.<\/p>\n<p style=\"text-align: justify;\">The Court took into account the case of <i>Garware Wall Ropes Ltd. v. Coastal Marine Constructions &amp; Engineering Ltd., <\/i><a href=\"http:\/\/www.scconline.com\/DocumentLink\/1x101VcA\">(2019) 9 SCC 209<\/a> where<i> <\/i>the Supreme Court had ruled that an arbitration agreement cannot be acted upon unless it is duly stamped. The Court relied upon the combined reading of Sections 3(b) and 19 of the Maharashtra Stamp Act, 1958 which specify that stamp duty has to be paid for instruments (1) executed out of State and (2) relating to any matter of <i>\u201cthing done or to be done\u201d<\/i> in the State and (3) is received in the State. In this backdrop, the Court proceeded to deal with whether arbitration would be a &#8220;thing to be done&#8221; under the abovementioned sections. In this regard, the judge observed that to insist that arbitration clauses alone are exempt from stamp duty under the Act would entail severing it from the rest of the agreement, which is not possible. It was clarified that arbitration is founded in the contract and<i> Garware Wall Ropes Case<\/i> also specifies that such a contract is one and indivisible at least to the extent of its arbitration agreement.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\">The Court further stated that even on a literal appreciation of the provisions of the Maharashtra Stamp Act, 1958 they could not rule in favour of the applicant. The Court finally clarified that if any stamp duty has been paid in the other state then an adjustment will be done but the applicant will not be exempted from paying stamp duty in Maharashtra. [S. Satyanarayana Co. v. West Quay Multiport (P) Ltd., <a href=\"http:\/\/www.scconline.com\/DocumentLink\/U745vaZV\"><b>2019 SCC OnLine Bom 4595<\/b><\/a>, decided on 22-11-2019]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bombay High Court:\u00a0G.S.Patel, J., held that an arbitration agreement must be stamped in the state where the arbitration is to take place, <\/p>\n","protected":false},"author":8808,"featured_media":74381,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,10],"tags":[10111,3174,38601,5951],"class_list":["post-222709","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-highcourts","tag-arbitration-agreement","tag-contract","tag-section-11-of-the-arbitration-and-conciliation-act","tag-stamp-duty"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state\" \/>\n<meta property=\"og:description\" content=\"Bombay High Court:\u00a0G.S.Patel, J., held that an arbitration agreement must be stamped in the state where the arbitration is to take place,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-30T06:00:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-12-05T07:27:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1331\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/\",\"name\":\"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg\",\"datePublished\":\"2019-11-30T06:00:21+00:00\",\"dateModified\":\"2019-12-05T07:27:51+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg\",\"width\":1331,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/","og_locale":"en_US","og_type":"article","og_title":"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state","og_description":"Bombay High Court:\u00a0G.S.Patel, J., held that an arbitration agreement must be stamped in the state where the arbitration is to take place,","og_url":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2019-11-30T06:00:21+00:00","article_modified_time":"2019-12-05T07:27:51+00:00","og_image":[{"width":1331,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/","url":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/","name":"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg","datePublished":"2019-11-30T06:00:21+00:00","dateModified":"2019-12-05T07:27:51+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg","width":1331,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/11\/30\/bom-hc-stamp-duty-cannot-be-avoided-on-arbitration-agreement-even-if-the-rest-of-the-contract-is-executed-outside-state\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Bom HC | Stamp duty cannot be avoided on arbitration agreement, even if the rest of the contract is executed outside state"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/09\/Bombay-HC.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":311001,"url":"https:\/\/www.scconline.com\/blog\/post\/2024\/01\/09\/right-to-preserve-the-substratum-of-subject-matter-of-dispute-arising-out-of-inadequately-stamped-agreement\/","url_meta":{"origin":222709,"position":0},"title":"Right to Preserve the Substratum of Subject-Matter of Dispute arising out of Inadequately Stamped Agreement","author":"Bhumika Indulia","date":"January 9, 2024","format":false,"excerpt":"by Abhijnan Jha\u2020, Bhagya K. Yadav\u2020\u2020 and Pranav Tomar\u2020\u2020\u2020","rel":"","context":"In &quot;Op Eds&quot;","block_context":{"text":"Op Eds","link":"https:\/\/www.scconline.com\/blog\/post\/category\/op-ed\/legal-analysis\/"},"img":{"alt_text":"Inadequately Stamped Agreement","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/01\/Inadequately-Stamped-Agreement.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/01\/Inadequately-Stamped-Agreement.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/01\/Inadequately-Stamped-Agreement.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2024\/01\/Inadequately-Stamped-Agreement.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":249317,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/06\/09\/unstamped-contract\/","url_meta":{"origin":222709,"position":1},"title":"\u00ad\u00ad\u00ad\u00adEnforceability of an Arbitration Agreement Embedded in an Unstamped Contract  N.N. Global Mercantile (P) Ltd. v. Indo Unique Flame Ltd. : A case comment","author":"Editor","date":"June 9, 2021","format":false,"excerpt":"by Shuchi Sejwar* and Akshata Sharma**","rel":"","context":"In &quot;Op Eds&quot;","block_context":{"text":"Op Eds","link":"https:\/\/www.scconline.com\/blog\/post\/category\/op-ed\/legal-analysis\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/MicrosoftTeams-image-7.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/MicrosoftTeams-image-7.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/MicrosoftTeams-image-7.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/MicrosoftTeams-image-7.png?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/06\/MicrosoftTeams-image-7.png?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":309167,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/12\/13\/7-judge-bench-verdict-supreme-court-judgment-on-validity-of-unstamped-arbitration-agreement\/","url_meta":{"origin":222709,"position":2},"title":"7-Judge Bench Verdict | Supreme Court Judgment on validity of Unstamped Arbitration Agreement","author":"Apoorva","date":"December 13, 2023","format":false,"excerpt":"\u201cThe concept of separability or severability of an arbitration agreement from the underlying contract is a legal fiction which acknowledges the separate nature of an arbitration agreement. The separate nature of the arbitration agreement from the underlying contract is one of the cornerstones of arbitration law\u201d","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/12\/MicrosoftTeams-image-195.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/12\/MicrosoftTeams-image-195.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/12\/MicrosoftTeams-image-195.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/12\/MicrosoftTeams-image-195.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":294300,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/06\/12\/impact-of-n-n-global-on-institutional-arbitrations-n-n-global-mercantile-p-ltd\/","url_meta":{"origin":222709,"position":3},"title":"One Step of Clarity and Two Steps into Oblivion: Impact of N.N. Global on Institutional Arbitrations | N.N. Global Mercantile (P) Ltd. v. Indo Unique Flame Ltd.: A case comment","author":"Editor","date":"June 12, 2023","format":false,"excerpt":"by Deepti Panda\u2020","rel":"","context":"In &quot;Op Eds&quot;","block_context":{"text":"Op Eds","link":"https:\/\/www.scconline.com\/blog\/post\/category\/op-ed\/legal-analysis\/"},"img":{"alt_text":"n.n. global on institutional arbitrations","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/n.n.-global-on-institutional-arbitrations.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/n.n.-global-on-institutional-arbitrations.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/n.n.-global-on-institutional-arbitrations.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/06\/n.n.-global-on-institutional-arbitrations.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":299891,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/08\/23\/delhi-high-court-discusses-modalities-unstamped-arbitration-agreement\/","url_meta":{"origin":222709,"position":4},"title":"&#8216;Certified copy&#8217; of the original arbitration agreement suffice if duly stamped, declaration made and uncontroverted for the purpose of S. 11 Arbitration Act","author":"Arunima","date":"August 23, 2023","format":false,"excerpt":"The case relates as to how the statutory mandate under Section 11(13) of Arbitration and Conciliation Act, 1996 which aims at expeditious disposal of petitions under Section 11 of the Act, is harmonized with the obligation imposed vide the judgment N.N. Global Mercantile (P) Ltd. v. Indo Unique Flame Ltd,\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"delhi high court","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/delhi-high-court.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/delhi-high-court.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/delhi-high-court.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/05\/delhi-high-court.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":248955,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/05\/31\/stamping-of-substantive-agreement-better-late-than-never\/","url_meta":{"origin":222709,"position":5},"title":"Stamping of Substantive Agreement: Better Late Than Never","author":"Bhumika Indulia","date":"May 31, 2021","format":false,"excerpt":"by Hiroo Advani\u2020, Tariq Khan\u2020\u2020 and Mahi Mehta \u2020\u2020\u2020 Cite as: 2021 SCC OnLine Blog Exp 39","rel":"","context":"In &quot;Op Eds&quot;","block_context":{"text":"Op Eds","link":"https:\/\/www.scconline.com\/blog\/post\/category\/op-ed\/legal-analysis\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/05\/MicrosoftTeams-image-87.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/05\/MicrosoftTeams-image-87.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/05\/MicrosoftTeams-image-87.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/05\/MicrosoftTeams-image-87.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/05\/MicrosoftTeams-image-87.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/222709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=222709"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/222709\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/74381"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=222709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=222709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=222709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}