{"id":217428,"date":"2019-07-29T13:35:30","date_gmt":"2019-07-29T08:05:30","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=217428"},"modified":"2019-08-09T15:17:37","modified_gmt":"2019-08-09T09:47:37","slug":"cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","title":{"rendered":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed"},"content":{"rendered":"<p style=\"text-align: justify;\"><b>Central Electricity Regulatory Commission (CERC):<\/b> Coram of P.K. Pujari (Chairperson) and Dr M.K. Iyer (Member) and I.S. Jha (Member) allowed the petition of the Odisha Power Generation Corporation Limited for drawal of start-up power and injection of infirm power from Unit-4 of the petitioner`s Thermal Power Plant at Jharsuguda to complete the auto loop tuning and unit stabilization on full load for the period up to 23.10.2019 or actual date of commercial operation, whichever is earlier, in terms of clause (7) of Regulation 8 of the Central Electricity Regulatory Commission Regulations, 2009.<\/p>\n<p style=\"text-align: justify;\">The Fourth Proviso to Regulation 8(7) of the Connectivity Regulations provides that the petitioner can seek an extension of the period for the interchange of power on an application to be filed at least two months in advance of the completion of the prescribed period. The petitioner could not approach the Commission within the stipulated time due to the technical failures faced at their Unit which were beyond the control of the petitioner. Therefore, it was constrained to file the present petition after the deadline of 23.5.2019, seeking an extension of time for drawal of infirm power.<\/p>\n<p style=\"text-align: justify;\">The Commission after taking into consideration the difficulties expressed by the petitioner allowed the instant petition, however, clarifying that extension of time granted as above shall not entitle the petitioner for IEDC\/IDC for the delay in declaration of COD from the scheduled COD which will be decided in accordance with the relevant provisions of the Tariff Regulations.[Odisha Power Generation Corpn. Ltd. v. Eastern Southern Regional Power Committee, <a href=\"http:\/\/scconline.com\/DocumentLink\/68TvvZ9I\"><b>2019 SCC OnLine CERC 74<\/b><\/a>, decided on 22-07-2019]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Central Electricity Regulatory Commission (CERC): Coram of P.K. Pujari (Chairperson) and Dr M.K. Iyer (Member) and I.S. Jha (Member) allowed the petition <\/p>\n","protected":false},"author":8808,"featured_media":210209,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,11],"tags":[36820,35692,30628,35303],"class_list":["post-217428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-tribunals_commissions_regulatorybodies","tag-cerc-regulations","tag-extension","tag-power","tag-tariff-regulations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed\" \/>\n<meta property=\"og:description\" content=\"Central Electricity Regulatory Commission (CERC): Coram of P.K. Pujari (Chairperson) and Dr M.K. Iyer (Member) and I.S. Jha (Member) allowed the petition\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-29T08:05:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-09T09:47:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/\",\"name\":\"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"datePublished\":\"2019-07-29T08:05:30+00:00\",\"dateModified\":\"2019-08-09T09:47:37+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","og_locale":"en_US","og_type":"article","og_title":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed","og_description":"Central Electricity Regulatory Commission (CERC): Coram of P.K. Pujari (Chairperson) and Dr M.K. Iyer (Member) and I.S. Jha (Member) allowed the petition","og_url":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2019-07-29T08:05:30+00:00","article_modified_time":"2019-08-09T09:47:37+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","url":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","name":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","datePublished":"2019-07-29T08:05:30+00:00","dateModified":"2019-08-09T09:47:37+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":225547,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/02\/13\/aptel-rejection-of-claim-by-the-cerc-under-regulation-14-of-tariff-regulations-set-aside-for-lack-of-justification\/","url_meta":{"origin":217428,"position":0},"title":"APTEL | Rejection of claim by the CERC under Regulation 14\u00a0 of Tariff Regulations set aside for lack of justification","author":"Bhumika Indulia","date":"February 13, 2020","format":false,"excerpt":"Appellate Tribunal for Electricity (APTEL): A Coram of Justice Manjula Chellur (Chairperson) and S.D. Dubey (Technical Member) allowed\u00a0an appeal filed against an impugned order passed by the Central Electricity Regulatory Commission pertaining to Vindhyachal Super Thermal Power Station Stage-II of the appellant. The appeal raises an objection as to whether\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":256892,"url":"https:\/\/www.scconline.com\/blog\/post\/2021\/11\/09\/cerc-repeals-cerc-regulation-of-power-supply-regulations-2010\/","url_meta":{"origin":217428,"position":1},"title":"CERC repeals CERC (Regulation of Power Supply) Regulations, 2010","author":"Prachi Bhardwaj","date":"November 9, 2021","format":false,"excerpt":"On October 26, 2021, the Central Electricity Regulatory Commission has repealed with immediate effect, the Central Electricity Regulatory Commission (Regulation of Power Supply) Regulations, 2010 along with the Central Electricity Regulatory Commission (Regulation of Power Supply) (First Amendment) Regulations, 2021. The gazette notification also states that any Implementation Plan already\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":214497,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","url_meta":{"origin":217428,"position":2},"title":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation","author":"Bhumika Indulia","date":"May 9, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a power generating company\u2019s petition for determination of tariff as infructuous, due to change in anticipated date of commercial operation (COD). Petitioner company had entered into power purchase agreements\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":217749,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/08\/06\/cerc-commission-approves-transmission-charges-of-two-400-kv-lines-for-inclusion-in-computation-of-point-of-connection-transmission-charges\/","url_meta":{"origin":217428,"position":3},"title":"CERC | Commission approves transmission charges of two 400 kV lines for inclusion in computation of point of connection transmission charges","author":"Bhumika Indulia","date":"August 6, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Bench of P.K. Pujari (Chairperson), Dr M.K. Iyer (Member) and I.S. Jha (Member) determined the transmission charges for the two 400 kV lines, namely, Seoni (MP)-Sarni (MP) and Seoni (MP)-Bhilai (Chhattisgarh) Transmission lines for the period from 2011-12 to 2013-14, for inclusion in computation\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":210208,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","url_meta":{"origin":217428,"position":4},"title":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019","author":"Bhumika Indulia","date":"February 18, 2019","format":false,"excerpt":"No. L-1\/144\/2013-CERC\u2014 In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in this behalf, and after previous publication, the Central Electricity Regulatory Commission hereby makes the following regulations, to amend Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations,\u2026","rel":"","context":"In &quot;Legislation Updates&quot;","block_context":{"text":"Legislation Updates","link":"https:\/\/www.scconline.com\/blog\/post\/category\/legislationupdates\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":233227,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/07\/31\/cerc-rejects-ntpcs-petition-for-removal-of-difficulties-on-the-aspect-of-the-severe-under-recovery-of-variable-charges-under-regulation-13-3-for-the-five-gas-based-generating-stations-of-ntpc\/","url_meta":{"origin":217428,"position":5},"title":"CERC rejects NTPC\u2019s plea for removal of difficulties on aspect of severe under-recovery of variable charges under Regulation 13.3 for five Gas Based Generating Stations of NTPC","author":"Editor","date":"July 31, 2020","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Bench of P. K. Pujari (Chairperson) and I.S. Jha (Member), Arun Goyal (Member), rejected the petition of NTPC Limited after finding it contrary to the ASO regulations and RRAS. NTPC Limited is a \u2018generating company\u2019 as defined under Section 2(28) of the Electricity Act,\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2016\/04\/Central-Regulatory-Electricity-Commission.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/217428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=217428"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/217428\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/210209"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=217428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=217428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=217428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}