{"id":214497,"date":"2019-05-09T13:36:22","date_gmt":"2019-05-09T08:06:22","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=214497"},"modified":"2019-05-09T13:35:48","modified_gmt":"2019-05-09T08:05:48","slug":"cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","title":{"rendered":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Central Electricity Regulatory Commission (CERC): <\/strong>The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a power generating company\u2019s petition for determination of tariff as infructuous, due to change in anticipated date of commercial operation (COD).<\/p>\n<p style=\"text-align: justify;\">Petitioner company had entered into power purchase agreements (PPAs) with the Respondents and power from the Gadarwara Super Thermal Power Station (generating station) had been allocated by the Ministry of Power. Unit-I of the generating station was test synchronized and the expected to commercially operate from 10-12-2018. Thus, the instant petition was filed for approval of tariff of Unit-I of generating station for the period from COD 10-12-2018 to 31-03-2019 in terms of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014.<\/p>\n<p style=\"text-align: justify;\">During the pendency of this petition, petitioner submitted that due to certain uncontrollable factors, Unit-I of the generating station could not achieve COD on or before 31-03-2019 and the said unit was expected to achieve COD during the period 2019-24. Accordingly, it sought permission to file a fresh petition for determination of tariff of Unit-I of the generating station from its anticipated COD till 31-03-2024 in terms of the provisions of the CERC Tariff Regulations, 2019.<\/p>\n<p style=\"text-align: justify;\">The Commission noted that Regulation 9(1) of the 2019 Tariff Regulations provides that a generating company can file an application for determination of tariff for the new generating station or units thereof which are expected to achieve commercial operation within 60 days of the filing of such application. Since Unit-I of generating station was expected to achieve COD by 30-04-2019, this petition filed in terms of the 2014 Tariff Regulations would be rendered infructuous.<\/p>\n<p style=\"text-align: justify;\">In view of the above, this petition was disposed of as infructuous; granting the petitioner company, liberty to file a fresh tariff petition in terms of 2019 Tariff Regulations. [NTPC Ltd. v. Madhya Pradesh Power Management Company Ltd., Petition No. 376\/GT\/2018, Order dated 30-04-2019]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Central Electricity Regulatory Commission (CERC): The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a <\/p>\n","protected":false},"author":8808,"featured_media":210209,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,11],"tags":[35305,35304,35307,35306,35303],"class_list":["post-214497","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casebriefs","category-tribunals_commissions_regulatorybodies","tag-commercial-operation","tag-fresh-tariff","tag-power-generating-company","tag-power-purchase-agreements","tag-tariff-regulations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation\" \/>\n<meta property=\"og:description\" content=\"Central Electricity Regulatory Commission (CERC): The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-05-09T08:06:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/\",\"name\":\"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"datePublished\":\"2019-05-09T08:06:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","og_locale":"en_US","og_type":"article","og_title":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation","og_description":"Central Electricity Regulatory Commission (CERC): The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a","og_url":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2019-05-09T08:06:22+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","url":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","name":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","datePublished":"2019-05-09T08:06:22+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":282222,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/01\/23\/agreement-for-procurement-electricity-stood-terminated-no-agreement-existed-no-dispute-with-respect-to-tariff-existed-to-adjudicated-by-cerc-legal-news-legal-research-updates\/","url_meta":{"origin":214497,"position":0},"title":"Delhi High Court| CERC does not have jurisdiction to adjudicate upon a dispute without Power Purchase Agreement","author":"Editor","date":"January 23, 2023","format":false,"excerpt":"The Court rejected the contention forwarded by defendant 3 to the effect that the present issue had an impact on tariff, as the actions of the plaintiff had prevented the applicant from supplying power to defendant 3 under the PSA resulting into defendant 3 being forced to secure power from\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"Delhi High Court","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2022\/12\/MicrosoftTeams-image-418.jpg?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":286691,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/03\/10\/explained-why-supreme-court-dismissed-appeal-filed-by-msedcl-and-passed-an-order-in-favour-of-adani-power-legal-news-legal-research-updates-change-in-law\/","url_meta":{"origin":214497,"position":1},"title":"Explained| Why Supreme Court dismissed MSEDCL&#8217;s appeal against compensation to Adani Power and GMR Warora Energy due to \u2018Change in Law\u2019?","author":"Editor","date":"March 10, 2023","format":false,"excerpt":"The Supreme Court upheld the judgement passed by the APTEL after observing that the generating companies were entitled to compensation so as to restore them to the same economic position, if the Change in Law had not occurred.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"Adani","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/03\/MicrosoftTeams-image-699.png?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/03\/MicrosoftTeams-image-699.png?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/03\/MicrosoftTeams-image-699.png?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/03\/MicrosoftTeams-image-699.png?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":172394,"url":"https:\/\/www.scconline.com\/blog\/post\/2017\/11\/30\/conduct-parties-sufficient-determine-mode-payment\/","url_meta":{"origin":214497,"position":2},"title":"Conduct of parties sufficient to determine the mode of payment","author":"Saba","date":"November 30, 2017","format":false,"excerpt":"Central Electricity Regulatory Commission:\u00a0In an order passed by Gireesh B Pradhan (Chairperson), AK Singhal, AS Bakshi and MK Iyer (Members) on a\u00a0 petition filed under Section 79(1)(f) of the Electricity Act, 2003 read with Regulations 44 & 45 of CERC (Terms and Conditions of Tariff), Regulations, 2014, the petiton challenged\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":354541,"url":"https:\/\/www.scconline.com\/blog\/post\/2025\/07\/25\/cerc-on-compensation-to-db-power-ltd-over-changes-in-law\/","url_meta":{"origin":214497,"position":3},"title":"Inside CERC\u2019s ruling where DB Power Ltd. sought compensation over changes in law, force majeure events relating to Power Purchase Agreements","author":"Editor","date":"July 25, 2025","format":false,"excerpt":"The Appellate Tribunal for Electricity had remanded matter to Central Electricity Regulatory Commission to reconsider issues pertaining to station heat rate, carrying cost, and increase in VAT, Entry Tax, etc. due to change in law, force majeure events affecting petitioner\u2019s project.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"compensation DB Power over changes in law","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2025\/07\/compensation-DB-Power-over-changes-in-law.webp?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":225547,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/02\/13\/aptel-rejection-of-claim-by-the-cerc-under-regulation-14-of-tariff-regulations-set-aside-for-lack-of-justification\/","url_meta":{"origin":214497,"position":4},"title":"APTEL | Rejection of claim by the CERC under Regulation 14\u00a0 of Tariff Regulations set aside for lack of justification","author":"Bhumika Indulia","date":"February 13, 2020","format":false,"excerpt":"Appellate Tribunal for Electricity (APTEL): A Coram of Justice Manjula Chellur (Chairperson) and S.D. Dubey (Technical Member) allowed\u00a0an appeal filed against an impugned order passed by the Central Electricity Regulatory Commission pertaining to Vindhyachal Super Thermal Power Station Stage-II of the appellant. The appeal raises an objection as to whether\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":161564,"url":"https:\/\/www.scconline.com\/blog\/post\/2017\/10\/05\/state-commission-cannot-re-determine-tariff-of-companies-if-already-determined-by-central-commission-under-s-79-of-electricity-act\/","url_meta":{"origin":214497,"position":5},"title":"State Commission cannot re-determine tariff of companies if already determined by Central Commission under S. 79 of Electricity Act","author":"Saba","date":"October 5, 2017","format":false,"excerpt":"Appellate Tribunal for Electricity: While deciding an appeal, a two-Member Bench comprising of Ranjana P. Desai, J. (Chairperson) and I. J. Kapoor, Technical Member, inter alia held that the State Commission overstepped its jurisdiction while limiting the liability of PSPCL towards the appellant and exceeded the scope of the order\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/214497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=214497"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/214497\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/210209"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=214497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=214497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=214497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}