{"id":210208,"date":"2019-02-18T18:00:57","date_gmt":"2019-02-18T12:30:57","guid":{"rendered":"https:\/\/www.scconline.com\/blog\/?p=210208"},"modified":"2019-02-18T14:30:26","modified_gmt":"2019-02-18T09:00:26","slug":"cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019","status":"publish","type":"post","link":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","title":{"rendered":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>No. L-1\/144\/2013-CERC\u2014<\/strong> In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in this behalf, and after previous publication, the Central Electricity Regulatory Commission hereby makes the following regulations, to amend Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014, (hereinafter referred to as &#8220;the Principal Regulations&#8221;), namely:<\/p>\n<p style=\"text-align: justify;\">1. Short title and commencement: (1) These regulations may be called the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019.<\/p>\n<p style=\"text-align: justify;\">(2) These regulations shall come into force with effect from the date of notification in the Official<br \/>\nGazette.<\/p>\n<p style=\"text-align: justify;\">2. Insertion of new Regulation: The following new Regulation shall be inserted after Regulation 49 of the Principal Regulations.<\/p>\n<p style=\"text-align: justify;\">&#8220;49A Transmission Majoration Factor:<\/p>\n<p style=\"text-align: justify;\">Transmission Majoration Factor admissible for the transmission projects executed through JV route in terms of Regulation 4.10A of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2001 shall be available for a period of 25 years from the date of issue of the transmission licence.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>No. L-1\/144\/2013-CERC\u2014 In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in <\/p>\n","protected":false},"author":8808,"featured_media":210209,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4,1193],"tags":[29618,2652,30844],"class_list":["post-210208","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-legislationupdates","category-notifications","tag-amendments","tag-Central_Electricity_Regulatory_Commission","tag-regulations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.4 (Yoast SEO v26.4) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019 | SCC Times<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019\" \/>\n<meta property=\"og:description\" content=\"No. L-1\/144\/2013-CERC\u2014 In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/\" \/>\n<meta property=\"og:site_name\" content=\"SCC Times\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/scc.online\/\" \/>\n<meta property=\"article:published_time\" content=\"2019-02-18T12:30:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1330\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Bhumika Indulia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Bhumika Indulia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/\",\"name\":\"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019 | SCC Times\",\"isPartOf\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"datePublished\":\"2019-02-18T12:30:57+00:00\",\"author\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg\",\"width\":1330,\"height\":887},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.scconline.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#website\",\"url\":\"https:\/\/www.scconline.com\/blog\/\",\"name\":\"SCC Times\",\"description\":\"Bringing you the Best Analytical Legal News\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.scconline.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a\",\"name\":\"Bhumika Indulia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"contentUrl\":\"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg\",\"caption\":\"Bhumika Indulia\"},\"url\":\"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019 | SCC Times","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","og_locale":"en_US","og_type":"article","og_title":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019","og_description":"No. L-1\/144\/2013-CERC\u2014 In exercise of powers conferred under Section 178 of the Electricity Act, 2003 and all other powers enabling it in","og_url":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","og_site_name":"SCC Times","article_publisher":"https:\/\/www.facebook.com\/scc.online\/","article_published_time":"2019-02-18T12:30:57+00:00","og_image":[{"width":1330,"height":887,"url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","type":"image\/jpeg"}],"author":"Bhumika Indulia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Bhumika Indulia","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","url":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/","name":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019 | SCC Times","isPartOf":{"@id":"https:\/\/www.scconline.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage"},"image":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage"},"thumbnailUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","datePublished":"2019-02-18T12:30:57+00:00","author":{"@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a"},"breadcrumb":{"@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#primaryimage","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","width":1330,"height":887},{"@type":"BreadcrumbList","@id":"https:\/\/www.scconline.com\/blog\/post\/2019\/02\/18\/cerc-central-electricity-regulatory-commission-terms-and-conditions-of-tariff-second-amendment-regulations-2019\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.scconline.com\/blog\/"},{"@type":"ListItem","position":2,"name":"CERC | Central Electricity Regulatory Commission (Terms and Conditions of Tariff) (Second Amendment) Regulations, 2019"}]},{"@type":"WebSite","@id":"https:\/\/www.scconline.com\/blog\/#website","url":"https:\/\/www.scconline.com\/blog\/","name":"SCC Times","description":"Bringing you the Best Analytical Legal News","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.scconline.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/919ec47cc1b871b362af05740398033a","name":"Bhumika Indulia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.scconline.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","contentUrl":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2021\/04\/Me-150x150.jpg","caption":"Bhumika Indulia"},"url":"https:\/\/www.scconline.com\/blog\/post\/author\/editor_1\/"}]}},"jetpack_featured_media_url":"https:\/\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-\u2013-CERC.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":172394,"url":"https:\/\/www.scconline.com\/blog\/post\/2017\/11\/30\/conduct-parties-sufficient-determine-mode-payment\/","url_meta":{"origin":210208,"position":0},"title":"Conduct of parties sufficient to determine the mode of payment","author":"Saba","date":"November 30, 2017","format":false,"excerpt":"Central Electricity Regulatory Commission:\u00a0In an order passed by Gireesh B Pradhan (Chairperson), AK Singhal, AS Bakshi and MK Iyer (Members) on a\u00a0 petition filed under Section 79(1)(f) of the Electricity Act, 2003 read with Regulations 44 & 45 of CERC (Terms and Conditions of Tariff), Regulations, 2014, the petiton challenged\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":214497,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/05\/09\/cerc-application-for-determination-of-tariff-can-be-filed-by-a-generating-company-60-days-before-anticipated-date-of-commercial-operation\/","url_meta":{"origin":210208,"position":1},"title":"CERC | Application for determination of tariff can be filed by a generating company, 60 days before anticipated date of commercial operation","author":"Bhumika Indulia","date":"May 9, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): The Coram of P.K Pujari (Chairperson), and Dr M.K. Iyer and I.S. Jha (Members) disposed of a power generating company\u2019s petition for determination of tariff as infructuous, due to change in anticipated date of commercial operation (COD). Petitioner company had entered into power purchase agreements\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":217428,"url":"https:\/\/www.scconline.com\/blog\/post\/2019\/07\/29\/cerc-petition-for-extension-of-drawal-of-power-beyond-stipulated-time-in-terms-of-cerc-regulations-allowed-considering-difficulties-faced-by-petitioner\/","url_meta":{"origin":210208,"position":2},"title":"CERC | Petition for extension of drawal of power beyond stipulated time in terms of CERC Regulations allowed","author":"Bhumika Indulia","date":"July 29, 2019","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): Coram of P.K. Pujari (Chairperson) and Dr M.K. Iyer (Member) and I.S. Jha (Member) allowed the petition of the Odisha Power Generation Corporation Limited for drawal of start-up power and injection of infirm power from Unit-4 of the petitioner`s Thermal Power Plant at Jharsuguda to\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":225547,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/02\/13\/aptel-rejection-of-claim-by-the-cerc-under-regulation-14-of-tariff-regulations-set-aside-for-lack-of-justification\/","url_meta":{"origin":210208,"position":3},"title":"APTEL | Rejection of claim by the CERC under Regulation 14\u00a0 of Tariff Regulations set aside for lack of justification","author":"Bhumika Indulia","date":"February 13, 2020","format":false,"excerpt":"Appellate Tribunal for Electricity (APTEL): A Coram of Justice Manjula Chellur (Chairperson) and S.D. Dubey (Technical Member) allowed\u00a0an appeal filed against an impugned order passed by the Central Electricity Regulatory Commission pertaining to Vindhyachal Super Thermal Power Station Stage-II of the appellant. The appeal raises an objection as to whether\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2017\/08\/Electricity1.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":223751,"url":"https:\/\/www.scconline.com\/blog\/post\/2020\/01\/02\/cerc-electricity-act-read-with-trading-margin-regulations-gives-contracting-parties-the-freedom-to-mutually-agree-on-trading-margin-for-any-trading-transaction\/","url_meta":{"origin":210208,"position":4},"title":"CERC | Electricity Act read with Trading Margin Regulations gives contracting parties freedom to mutually agree on Trading Margin for any trading transaction","author":"Bhumika Indulia","date":"January 2, 2020","format":false,"excerpt":"Central Electricity Regulatory Commission (CERC): A coram of Justice P.K. Pujari (Chairperson), M.K. Iyer (Member) and I.S. Jha (Member) disposed of a petition filed under Section 63 of the Electricity Act, 2003 seeking adoption of tariff for 1000 MW (Tranche-II) Wind Power Projects connected to the Inter-State Transmission System (ISTS)\u2026","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2019\/02\/Central-Electricity-Regulatory-Commission-%E2%80%93-CERC.jpg?resize=1050%2C600&ssl=1 3x"},"classes":[]},{"id":296446,"url":"https:\/\/www.scconline.com\/blog\/post\/2023\/07\/10\/state-commissions-cannot-decide-trade-margins-ists-power-projects-legal-news\/","url_meta":{"origin":210208,"position":5},"title":"State Commissions cannot modify tariff adopted by Central Commission and adopt trade margin for ISTS power projects: APTEL","author":"Apoorva","date":"July 10, 2023","format":false,"excerpt":"APTEL said that in accordance with the guidelines and the CERC Regulations, the Appropriate Commission, the trading margin shall be decided mutually by the SECI, the trading licensee and the WPPs and in turn by the distribution licensees.","rel":"","context":"In &quot;Case Briefs&quot;","block_context":{"text":"Case Briefs","link":"https:\/\/www.scconline.com\/blog\/post\/category\/casebriefs\/"},"img":{"alt_text":"appellate tribunal for electricity","src":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/www.scconline.com\/blog\/wp-content\/uploads\/2023\/07\/appellate-tribunal-for-electricity.webp?resize=700%2C400&ssl=1 2x"},"classes":[]}],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/210208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/users\/8808"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/comments?post=210208"}],"version-history":[{"count":0,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/posts\/210208\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media\/210209"}],"wp:attachment":[{"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/media?parent=210208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/categories?post=210208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scconline.com\/blog\/wp-json\/wp\/v2\/tags?post=210208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}