https://www.scconline.com/blog/post/2023/04/22/adani-power-entitled-to-change-in-law-for-100-of-contracted-capacity-which-is-70-of-installed-capacity-of-the-phase-iv-extension-of-mundra-project-supreme-court-legal-resear/
Adani power entitled to Change in Law for 100% of contracted capacity which is 70% of installed capacity of Phase IV extension of Mundra Project: Supreme Court