https://www.scconline.com/blog/post/2019/08/06/cerc-commission-approves-transmission-charges-of-two-400-kv-lines-for-inclusion-in-computation-of-point-of-connection-transmission-charges/
CERC | Commission approves transmission charges of two 400 kV lines for inclusion in computation of point of connection transmission charges